Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11352
Well Classification: GW Status: PR - 10/20/2005
Well Name/No:CHEVRON #NG 323-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/20/2005
FacilityID:280767LocationID:335619
County:GARFIELD #045Location:NWSW 8 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5791 ft.
Basin:PICEANCE BASIN  
Planned Location:1427FSL  1206 FWLLat/Long: 39.535537 / -108.136448Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.535629 / -108.136230Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/15/2005             Measured TD: 7647 ft.    Vertical TD: 7505 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/15/2005
Wellbore PermitDIRECTIONAL
Permit #:20053431 Expiration Date:10/19/2006
Proposed Top PZ Location:Sec:8 Twp: 6S 96W Footage: 2017 FSL  2215 FWL
Bottom Hole Location:Sec:8 Twp: 6S 96W Footage: 2017 FSL  2215 FWL
Proposed Depth/Form:7660 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: , Drill Unit: NONE

Wellbore Completed
Completion Date:5/28/2006
Spud Date:5/14/2006Spud Date Is:ACTUAL
Measured TD:7647 ft.Measured PB depth:7590 ft.
True Vertical TD:7505 ft.True Vertical PB depth:
Top PZ Location:Sec:8 Twp: 6S 96WFootage: 2017 FSL  2215 FWL
Bottom Hole Location:Sec:8 Twp: 6S 96WFootage: 2017 FSL  2215 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1133 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1132 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7613 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 3700 ft., Bottom: 7612 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2429 ft.NN
FORT UNION2758 ft.NN
MESAVERDE4242 ft.NN
CAMEO6976 ft.NN
ROLLINS7455 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/21/2006                 Interval Top: 5742 ft.    Interval Bottom: 7378 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/15/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/11/2006
Treatment Summary:2496 GALS 7 1/2% HCL; 632000 # 30/50 SAND; 14904 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6952 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/21/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1909
MCF_GAS 1592
TUBING_PRESS 1826
Perforation Data:
Interval Top:5742 ft.# Of Holes:87
Interval Bottom:7378 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)26359
GOR798757
GOR DeterminationMCFE
Average BOE per Day12.550
Average MCFE per Day72.766

 Federal Financial Assurance  i 

 Tribal Well  i No