Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11332
Well Classification: GW Status: PR - 7/20/2006
Well Name/No:KNIGHT #PA 412-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 51015
Facility Status:PRStatus Date7/20/2006
FacilityID:280724LocationID:334626
County:GARFIELD #045Location:NENE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5092 ft.
Basin:PICEANCE BASIN  
Planned Location:1282FNL  470 FELLat/Long: 39.470279 / -108.013833Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.470295 / -108.013851Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/20/2006             Measured TD: 6758 ft.    Vertical TD: 6466 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/20/2006
Wellbore PermitDIRECTIONAL
Permit #:20063716 Expiration Date:9/13/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2010 FNL  736 FWL
Bottom Hole Location:Sec: Twp: Footage: 2010 FNL  736 FWL
Proposed Depth/Form:6758 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/19/2006
Spud Date:8/12/2006Spud Date Is:ACTUAL
Measured TD:6758 ft.Measured PB depth:6714 ft.
True Vertical TD:6466 ft.True Vertical PB depth:
Top PZ Location:Sec:4 Twp: 7S 95WFootage: 2029 FNL  757 FWL
Bottom Hole Location:Sec:4 Twp: 7S 95WFootage: 2029 FNL  757 FWL
Log Types:CBL; RMTE; HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1435 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 329, Top: 0 ft., Bottom: 1435 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6749 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 1970 ft., Bottom: 6749 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1160 ft.NN
FORT UNION1440 ft.NN
MESAVERDE3465 ft.NN
CAMEO5927 ft.NN
ROLLINS6607 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/16/2006                Interval Top: 4618 ft.    Interval Bottom: 6589 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/10/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/6/2006
Treatment Summary:4025 GALS 7 1/2% HCL; 178,500# 30/50 SAND; 19,315 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6132 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/16/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1110
MCF_GAS 949
TUBING_PRESS 1044
Perforation Data:
Interval Top:4618 ft.# Of Holes:147
Interval Bottom:6589 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)19113
GOR659068
GOR DeterminationMCFE
Average BOE per Day9.111
Average MCFE per Day52.854

 Federal Financial Assurance  i 

 Tribal Well  i No