|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/7/2005 Measured TD: 6876 ft. Vertical TD: 6437 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/7/2005 | | Wellbore Permit | | | Permit #: | 20053303 | Expiration Date: | 10/17/2006 | | Proposed Depth/Form: | 6921 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 6/11/2006 | | Spud Date: | 6/4/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 6876 ft. | Measured PB depth: | 6838 ft. | | True Vertical TD: | 6437 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:5 Twp: 7S 95W | Footage: 1103 FNL 2637 FEL | | Bottom Hole Location: | Sec:5 Twp: 7S 95W | Footage: 1103 FNL 2637 FEL | | Log Types: | CBL; RESERVOIR MONITOR TOOL ELITE | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1475 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 1475 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6871 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 3350 ft., Bottom: 6871 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1230 ft. | | N | N | | FORT UNION | 1643 ft. | | N | N | | MESAVERDE | 3610 ft. | | N | N | | CAMEO | 6082 ft. | | N | N | | ROLLINS | 6772 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 9/10/2006 Interval Top: 4832 ft. Interval Bottom: 6699 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/9/2006 | Choke Size: | 0.203 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/7/2006 | | Treatment Summary: | 4279 GAL 7 1/2% HCL; 913,700# 30/50 SAND; 21,107 BBLS SLICKWATER (SUMMARY) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6398 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/10/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CASING_PRESS | 1581 | | TUBING_PRESS | 1467 |
| | Perforation Data: | | Interval Top: | 4832 ft. | # Of Holes: | 143 | | Interval Bottom: | 6699 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 26 |
| Total Gas Produced (MCF) | 21222 |
| GOR | 816230 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.095 |
| Average MCFE per Day | 58.559 |
| Federal Financial Assurance | i | |
|
|