Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11321
Well Classification: GW Status: PR - 10/17/2005
Well Name/No:KNIGHT #PA 332-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/17/2005
FacilityID:280670LocationID:334652
County:GARFIELD #045Location:SENE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5090 ft.
Basin:PICEANCE BASIN  
Planned Location:1961FNL  960 FELLat/Long: 39.468419 / -108.015493Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.468457 / -108.015542Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/7/2005             Measured TD: 6673 ft.    Vertical TD: 6411 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/7/2005
Wellbore PermitDIRECTIONAL
Permit #:20053309 Expiration Date:10/16/2006
Proposed Top PZ Location:Sec:5 Twp: 7S 95W Footage: 1785 FNL  2270 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 1785 FNL  2270 FEL
Proposed Depth/Form:6691 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:6/3/2006
Spud Date:5/28/2006Spud Date Is:ACTUAL
Measured TD:6673 ft.Measured PB depth:6619 ft.
True Vertical TD:6411 ft.True Vertical PB depth:
Top PZ Location:Sec:5 Twp: 7S 95WFootage: 1730 FNL  2275 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95WFootage: 1730 FNL  2275 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1470 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1470 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6669 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 2496 ft., Bottom: 6669 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1225 ft.NN
FORT UNION1623 ft.NN
MESAVERDE3494 ft.NN
CAMEO5902 ft.NN
ROLLINS6588 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/5/2006                  Interval Top: 4872 ft.    Interval Bottom: 6512 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/9/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/7/2006
Treatment Summary:3713 GALS 7 1/2% HCL; 798,800# 30/50 SAND; 18,714 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6150 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1425
MCF_GAS 1114
TUBING_PRESS 1390
Perforation Data:
Interval Top:4872 ft.# Of Holes:131
Interval Bottom:6512 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)18480
GOR803478
GOR DeterminationMCFE
Average BOE per Day8.791
Average MCFE per Day51.005

 Federal Financial Assurance  i 

 Tribal Well  i No