Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11321
Well Classification: GW Status: PR - 10/17/2005
Well Name/No:KNIGHT #PA 332-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/17/2005
FacilityID:280670LocationID:334652
County:GARFIELD #045Location:SENE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5090 ft.
Basin:PICEANCE BASIN  
Planned Location:1961FNL  960 FELLat/Long: 39.468419 / -108.015493Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.468457 / -108.015542Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/7/2005             Measured TD: 6673 ft.    Vertical TD: 6411 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/7/2005
Wellbore PermitDIRECTIONAL
Permit #:20053309 Expiration Date:10/16/2006
Proposed Top PZ Location:Sec:5 Twp: 7S 95W Footage: 1785 FNL  2270 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 1785 FNL  2270 FEL
Proposed Depth/Form:6691 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:6/3/2006
Spud Date:5/28/2006Spud Date Is:ACTUAL
Measured TD:6673 ft.Measured PB depth:6619 ft.
True Vertical TD:6411 ft.True Vertical PB depth:
Top PZ Location:Sec:5 Twp: 7S 95WFootage: 1730 FNL  2275 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95WFootage: 1730 FNL  2275 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1470 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1470 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6669 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 2496 ft., Bottom: 6669 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1225 ft.NN
FORT UNION1623 ft.NN
MESAVERDE3494 ft.NN
CAMEO5902 ft.NN
ROLLINS6588 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/5/2006                  Interval Top: 4872 ft.    Interval Bottom: 6512 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/9/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/7/2006
Treatment Summary:3713 GALS 7 1/2% HCL; 798,800# 30/50 SAND; 18,714 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6150 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1425
MCF_GAS 1114
TUBING_PRESS 1390
Perforation Data:
Interval Top:4872 ft.# Of Holes:131
Interval Bottom:6512 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)17269
GOR750826
GOR DeterminationMCFE
Average BOE per Day8.231
Average MCFE per Day47.741

 Federal Financial Assurance  i 

 Tribal Well  i No