Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11315
Well Classification: GW Status: PR - 10/17/2005
Well Name/No:KNIGHT #PA 512-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 51015
Facility Status:PRStatus Date10/17/2005
FacilityID:280663LocationID:334626
County:GARFIELD #045Location:NENE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5092 ft.
Basin:PICEANCE BASIN  
Planned Location:1286FNL  477 FELLat/Long: 39.470259 / -108.013863Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.470280 / -108.013870Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/6/2005             Measured TD: 6842 ft.    Vertical TD: 6443 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/6/2005
Wellbore PermitDIRECTIONAL
Permit #:20053302 Expiration Date:10/16/2006
Proposed Top PZ Location:Sec:4 Twp: 7S 95W Footage: 2281 FNL  721 FWL
Bottom Hole Location:Sec:4 Twp: 7S 96W Footage: 2281 FNL  721 FWL
Proposed Depth/Form:6770 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:7/30/2006
Spud Date:7/22/2006Spud Date Is:ACTUAL
Measured TD:6842 ft.Measured PB depth:6800 ft.
True Vertical TD:6443 ft.True Vertical PB depth:
Top PZ Location:Sec:4 Twp: 7S 95WFootage: 2352 FNL  779 FWL
Bottom Hole Location:Sec:4 Twp: 7S 95WFootage: 2352 FNL  779 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1438 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 0 ft., Bottom: 1438 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6835 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 930, Top: 2170 ft., Bottom: 6834 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1160 ft.NN
FORT UNION1440 ft.NN
MESAVERDE3506 ft.NN
CAMEO5998 ft.NN
ROLLINS6670 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/16/2006                Interval Top: 4671 ft.    Interval Bottom: 6658 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/10/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/6/2006
Treatment Summary:4020 GALS 7 1/2% HCL; 762,600# 30/50 SAND; 18,756 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6268 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/16/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1306
TUBING_PRESS 1241
Perforation Data:
Interval Top:4671 ft.# Of Holes:149
Interval Bottom:6658 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)14154
GOR744947
GOR DeterminationMCFE
Average BOE per Day6.745
Average MCFE per Day39.100

 Federal Financial Assurance  i 

 Tribal Well  i No