Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11314
Well Classification: GW Status: PR - 10/17/2005
Well Name/No:KNIGHT #PA 432-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/17/2005
FacilityID:280662LocationID:334652
County:GARFIELD #045Location:SENE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5090 ft.
Basin:PICEANCE BASIN  
Planned Location:1968FNL  953 FELLat/Long: 39.468399 / -108.015463Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.468440 / -108.015514Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/6/2005             Measured TD: 6682 ft.    Vertical TD: 6413 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/6/2005
Wellbore PermitDIRECTIONAL
Permit #:20053301 Expiration Date:10/16/2006
Proposed Top PZ Location:Sec:5 Twp: 7S 95W Footage: 2079 FNL  2292 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 2079 FNL  2292 FEL
Proposed Depth/Form:6704 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:5/27/2006
Spud Date:5/18/2006Spud Date Is:ACTUAL
Measured TD:6682 ft.Measured PB depth:6614 ft.
True Vertical TD:6413 ft.True Vertical PB depth:
Top PZ Location:Sec:5 Twp: 7S 95WFootage: 2061 FNL  2297 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95WFootage: 2061 FNL  2297 FEL
Log Types:CBL; PLATFORM EXPRESS-ARRAY INDUCTION/GAMMA RAY/SP
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1475 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 1475 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6664 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 2710 ft., Bottom: 6664 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1211 ft.NN
FORT UNION1621 ft.NN
MESAVERDE3497 ft.NN
CAMEO5909 ft.NN
ROLLINS6581 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/7/2006                  Interval Top: 4670 ft.    Interval Bottom: 6500 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/9/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:7/7/2006
Treatment Summary:4535 GALS 7 1/2% HCL; 871,900# 30/50 SAND; 20,376 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6126 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1754
MCF_GAS 1434
TUBING_PRESS 1637
Perforation Data:
Interval Top:4670 ft.# Of Holes:147
Interval Bottom:6500 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)15879
GOR835736
GOR DeterminationMCFE
Average BOE per Day7.551
Average MCFE per Day43.801

 Federal Financial Assurance  i 

 Tribal Well  i No