|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2022 Measured TD: 12445 ft. Vertical TD: 12321 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/20/2011 | | Proposed Top PZ Location: | Sec:15 Twp: 5S 95W | Footage: 1650 FSL 2310 FEL | | Bottom Hole Location: | Sec:15 Twp: 5S 95W | Footage: 1650 FSL 2310 FEL | | Proposed Depth/Form: | 13000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: , Depth: 90 ft., Weight: 55 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: , Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 13349 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1380, Top: 200 ft., Bottom: 13349 ft. | | Casing: | String Type: 2ND, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 8600 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 8000 ft., Bottom: 8600 ft. | | Casing: | String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 13000 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 600, Top: , Bottom: 13000 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/5/2010 | | Spud Date: | 10/20/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 12445 ft. | Measured PB depth: | 12223 ft. | | True Vertical TD: | 12321 ft. | True Vertical PB depth: | 12099 ft. | | Top PZ Location: | Sec:15 Twp: 5S 95W | Footage: 2433 FNL 2429 FWL | | Bottom Hole Location: | Sec:15 Twp: 5S 95W | Footage: 2433 FNL 2429 FWL | | Log Types: | RST/CBL Combo | | Log Types: | RST | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 123 ft., Weight: 55 , Citings Type: ACTUAL | | Cement: | Sacks: 276, Top: 0 ft., Bottom: 123 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2962 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1443, Top: 0 ft., Bottom: 2962 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12422 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 689, Top: 5758 ft., Bottom: 12422 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | 4353 ft. | | | | WASATCH | 4353 ft. | 5853 ft. | | | | FORT UNION | 5853 ft. | 8653 ft. | | | | OHIO CREEK | 8653 ft. | 8953 ft. | | | | WILLIAMS FORK | 8953 ft. | 11803 ft. | | | | CAMEO | 11803 ft. | 12153 ft. | | | | ROLLINS | 12153 ft. | | | |
Formation WMFK Formation Classification: GW Status: PR - 8/1/2022 Interval Top: 9107 ft. Interval Bottom: 11477 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 1/24/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/11/2011 | | Treatment Summary: | Completed initial 6 stages using 851,789 lbs 20/40 white sand and 39,553 bbls slickwater. Led w/ 3,000 gal 7.5% acid.
Stage 1 - 11,477-11,805' - 32 holes @ 2 spf. Frac'd w/ 97,370 lbs 20/40 white sand and 4,235 bbls slickwater fluid. Led w/ 500 gal 7.5% acid.
Stage 2 -11,001-11,414' - 26 holes @ 2 spf. Frac'd w/ 114,400 lbs 20/40 white sand and 6,259 bbls slickwater fluid. Led w/ 500 gal 7.5% acid.
Stage 3 - 10,582-10,799' - 32 holes @ 2 spf. Frac'd w/ 167,279 lbs 20/40 white sand and 8,535 bbls slickwater fluid. Led w/ 500 gal 7.5% acid.
Stage 4- 10,265-10,509' - 30 holes @ 2 spf. Frac'd w/ 156,340 lbs 20/40 white sand and 6,977 bbls slickwater fluid. Led w/ 500 gal 7.5% acid.
Stage 5 -9,926-10,164' - 22 holes @ 2 spf. Frac'd w/ 140,000 lbs 20/40 white sand and 6,129 bbls slickwater fluid. Led w/ 500 gal 7.5% acid.
Stage 6 -9,107-9,554' - 28 holes @ 2 spf. Frac'd w/ 176,400 lbs 20/40 white sand and 7,418 bbls slickwater fluid. Led w/ 500 gal 7.5% acid. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11425 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/30/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 380 | | CALC_BBLS_H2O | 380 | | CALC_MCF_GAS | 293 | | CASING_PRESS | 1850 | | MCF_GAS | 293 | | TUBING_PRESS | 880 |
| | Perforation Data: | | Interval Top: | 9107 ft. | # Of Holes: | 170 | | Interval Bottom: | 11477 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 52 |
| Total Gas Produced (MCF) | 9174 |
| GOR | 176423 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.483 |
| Average MCFE per Day | 25.994 |
| Federal Financial Assurance | i | |
|
|