Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11277
Well Classification: GW Status: PR - 10/8/2006
Well Name/No:N.PARACHUTE #EFO6B I30A 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/8/2006
FacilityID:280531LocationID:335807
County:GARFIELD #045Location:NESE 30 5S95W 6
Field:GRAND VALLEY - #31290Elevation:5925 ft.
Basin:PICEANCE BASIN  
Planned Location:1687FSL  1080 FELLat/Long: 39.582127 / -108.091237Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.582194 / -108.091174Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/8/2006             Measured TD: 10312 ft.    Vertical TD: 9337 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/8/2006
Wellbore PermitDIRECTIONAL
Permit #:20053054 Expiration Date:10/6/2006
Proposed Top PZ Location:Sec:30 Twp: 5S 95W Footage: 1666 FNL  2348 FWL
Bottom Hole Location:Sec:30 Twp: 5S 95W Footage: 1666 FNL  2348 FWL
Proposed Depth/Form:10913 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/11/2006
Spud Date:11/26/2005Spud Date Is:ACTUAL
Measured TD:10312 ft.Measured PB depth:10275 ft.
True Vertical TD:9337 ft.True Vertical PB depth:9300 ft.
Top PZ Location:Sec:30 Twp: 5S 95WFootage: 1651 FNL  2222 FWL
Bottom Hole Location:Sec:30 Twp: 5S 95WFootage: 1651 FNL  2222 FWL
Log Types:CBL/TEMP/GR/CCL (COMBINED), MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2480 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 0 ft., Bottom: 2480 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10300 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1582, Top: 2600 ft., Bottom: 10300 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6418 ft.10029 ft.NN
ROLLINS10029 ft.10275 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/8/2006                 Interval Top: 6432 ft.    Interval Bottom: 9911 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/1/2006Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/6/2006
Treatment Summary:STAGES 01-08 TREATED W/51882 BBLS SLICKWATE, 1517538 LBS 20-40 SAND, 192 BBLS 15% HCL.
Tubing Size:2.375 in.Tubing Setting Depth:8819 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/8/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 998
CASING_PRESS 923
MCF_GAS 998
TUBING_PRESS 53
Perforation Data:
Interval Top:6432 ft.# Of Holes:180
Interval Bottom:9911 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)44
Total Gas Produced (MCF)7746
GOR176045
GOR DeterminationMCFE
Average BOE per Day3.775
Average MCFE per Day21.919

 Federal Financial Assurance  i 

 Tribal Well  i No