Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11274
Well Classification: GW Status: PR - 2/28/2006
Well Name/No:PUCKETT #GM 423-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/28/2006
FacilityID:280521LocationID:335087
County:GARFIELD #045Location:NESW 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5738 ft.
Basin:PICEANCE BASIN  
Planned Location:2594FSL  2312 FWLLat/Long: 39.480228 / -108.133537Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.480317 / -108.133529Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/28/2006             Measured TD: 6676 ft.    Vertical TD: 6664 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/28/2006
Wellbore PermitDIRECTIONAL
Permit #:20053182 Expiration Date:10/5/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2005 FSL  2240 FWL
Bottom Hole Location:Sec: Twp: Footage: 2005 FSL  2240 FWL
Proposed Depth/Form:6672 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:12/3/2005
Spud Date:11/24/2005Spud Date Is:ACTUAL
Measured TD:6676 ft.Measured PB depth:6664 ft.
True Vertical TD:6664 ft.True Vertical PB depth:
Top PZ Location:Sec:32 Twp: 6S 96WFootage: 2007 FSL  2250 FWL
Bottom Hole Location:Sec:32 Twp: 6S 96WFootage: 2007 FSL  2250 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1132 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1132 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6654 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 771, Top: 2470 ft., Bottom: 6654 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1968 ft.NN
FORT UNION2274 ft.NN
MESAVERDE3535 ft.NN
CAMEO6028 ft.NN
ROLLINS6520 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/28/2006                 Interval Top: 4886 ft.    Interval Bottom: 6462 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/21/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2006
Treatment Summary:3,957 GALS 7.5% HCL; 750,100# 30/50 SAND; 17,585 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5923 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1363
CASING_PRESS 1397
TUBING_PRESS 1294
Perforation Data:
Interval Top:4886 ft.# Of Holes:110
Interval Bottom:6462 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)19167
GOR660931
GOR DeterminationMCFE
Average BOE per Day9.085
Average MCFE per Day52.707

 Federal Financial Assurance  i 

 Tribal Well  i No