Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11273
Well Classification: GW Status: PR - 3/1/2006
Well Name/No:PUCKETT #GM 422-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2006
FacilityID:280520LocationID:335087
County:GARFIELD #045Location:NESW 32 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5738 ft.
Basin:PICEANCE BASIN  
Planned Location:2625FSL  2279 FWLLat/Long: 39.480308 / -108.133657Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.480404 / -108.133630Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2006             Measured TD: 6614 ft.    Vertical TD: 6605 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2006
Wellbore PermitDIRECTIONAL
Permit #:20053181 Expiration Date:10/5/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2408 FNL  2210 FWL
Bottom Hole Location:Sec: Twp: Footage: 2408 FNL  2210 FWL
Proposed Depth/Form:6684 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:1/2/2006
Spud Date:12/26/2005Spud Date Is:ACTUAL
Measured TD:6614 ft.Measured PB depth:6536 ft.
True Vertical TD:6605 ft.True Vertical PB depth:
Top PZ Location:Sec:32 Twp: 6S 96WFootage: 2428 FNL  2209 FWL
Bottom Hole Location:Sec:32 Twp: 6S 96WFootage: 2428 FNL  2209 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 0 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1124 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6596 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 818, Top: 3205 ft., Bottom: 6595 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1964 ft.NN
FORT UNION2259 ft.NN
MESAVERDE3516 ft.NN
CAMEO6020 ft.NN
ROLLINS6534 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2006                  Interval Top: 4833 ft.    Interval Bottom: 6305 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/21/2006Choke Size:0.281 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/19/2006
Treatment Summary:2500 GALS 10% ACETIC ACID; 1001 GALS 7 1/2% HCL; 630400# 30/50 SAND; 14943 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5797 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1373
CASING_PRESS 1042
TUBING_PRESS 894
Perforation Data:
Interval Top:4833 ft.# Of Holes:91
Interval Bottom:6305 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)10
Total Gas Produced (MCF)6174
GOR617400
GOR DeterminationMCFE
Average BOE per Day2.940
Average MCFE per Day17.082

 Federal Financial Assurance  i 

 Tribal Well  i No