Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11267
Well Classification: GW Status: PR - 5/8/2006
Well Name/No:CLOUGH #RWF 432-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/8/2006
FacilityID:280514LocationID:335494
County:GARFIELD #045Location:SWNE 29 6S94W 6
Field:RULISON - #75400Elevation:5225 ft.
Basin:PICEANCE BASIN  
Planned Location:1693FNL  2194 FELLat/Long: 39.498679 / -107.910271Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.498770 / -107.910276Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/8/2006             Measured TD: 7634 ft.    Vertical TD: 7619 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/8/2006
Wellbore PermitDIRECTIONAL
Permit #:20053159 Expiration Date:10/5/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1533 FNL  1866 FEL
Bottom Hole Location:Sec: Twp: Footage: 1533 FNL  1866 FEL
Proposed Depth/Form:7645 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-7 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:3/19/2006
Spud Date:3/4/2006Spud Date Is:ACTUAL
Measured TD:7634 ft.Measured PB depth:7560 ft.
True Vertical TD:7619 ft.True Vertical PB depth:
Top PZ Location:Sec:29 Twp: 6S 94WFootage: 1492 FNL  1864 FEL
Bottom Hole Location:Sec:29 Twp: 6S 94WFootage: 1492 FNL  1864 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1137 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1137 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7621 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1135, Top: 3200 ft., Bottom: 7621 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3200 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 2468 ft., Bottom: 3200 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH G1622 ft.NN
MESAVERDE4026 ft.NN
CAMEO6667 ft.NN
ROLLINS7563 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/8/2006                  Interval Top: 5276 ft.    Interval Bottom: 7447 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/7/2006Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/6/2006
Treatment Summary:3,819 GALS 7.5% HCL; 884,200# 20/40 SAND; 21,257 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7107 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 160200
CALC_MCF_GAS 1602
CASING_PRESS 2579
MCF_GAS 1602
TUBING_PRESS 2456
Perforation Data:
Interval Top:5276 ft.# Of Holes:142
Interval Bottom:7447 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)18934
GOR573757
GOR DeterminationMCFE
Average BOE per Day9.038
Average MCFE per Day52.401

 Federal Financial Assurance  i 

 Tribal Well  i No