Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11265
Well Classification: GW Status: PR - 5/8/2006
Well Name/No:CLOUGH #RMV 97-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62978
Facility Status:PRStatus Date5/8/2006
FacilityID:280512LocationID:335494
County:GARFIELD #045Location:SWNE 29 6S94W 6
Field:RULISON - #75400Elevation:5225 ft.
Basin:PICEANCE BASIN  
Planned Location:1704FNL  2222 FELLat/Long: 39.498649 / -107.910371Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.498738 / -107.910373Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/8/2006             Measured TD: 7642 ft.    Vertical TD: 7613 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/8/2006
Wellbore PermitDIRECTIONAL
Permit #:20053157 Expiration Date:10/5/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2172 FNL  1985 FEL
Bottom Hole Location:Sec: Twp: Footage: 2172 FNL  1985 FEL
Proposed Depth/Form:7661 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-7 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:2/17/2006
Spud Date:2/3/2006Spud Date Is:ACTUAL
Measured TD:7642 ft.Measured PB depth:7567 ft.
True Vertical TD:7613 ft.True Vertical PB depth:
Top PZ Location:Sec:29 Twp: 6S 94WFootage: 2120 FNL  1965 FEL
Bottom Hole Location:Sec:29 Twp: 6S 94WFootage: 2120 FNL  1965 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1126 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1126 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7628 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1117, Top: 2930 ft., Bottom: 7628 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1641 ft.NN
MESAVERDE4042 ft.NN
CAMEO6662 ft.NN
ROLLINS7541 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/8/2006                  Interval Top: 5232 ft.    Interval Bottom: 7458 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/7/2006Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/6/2006
Treatment Summary:3,752 GALS 7.5% HCL; 839,300# 20/40 SAND; 20,478 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7152 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 156700
CALC_MCF_GAS 1567
CASING_PRESS 2476
MCF_GAS 1567
TUBING_PRESS 2362
Perforation Data:
Interval Top:5232 ft.# Of Holes:139
Interval Bottom:7458 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)49
Total Gas Produced (MCF)26634
GOR543551
GOR DeterminationMCFE
Average BOE per Day12.719
Average MCFE per Day73.755

 Federal Financial Assurance  i 

 Tribal Well  i No