Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11255
Well Classification: GW Status: PR - 4/1/2025
Well Name/No:CHEVRON #5-432D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:280442LocationID:335585
County:GARFIELD #045Location:SWSW 4 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5708 ft.
Basin:PICEANCE BASIN  
Planned Location:447FSL  269 FWLLat/Long: 39.547927 / -108.120317Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.547944 / -108.120272Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2025             Measured TD: 8150 ft.    Vertical TD: 7636 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2025
Wellbore Permit
Permit #:20052961 Expiration Date:10/3/2006
Bottom Hole Location:Sec:5 Twp: 6S 96W Footage: 660 FSL  1650 FEL
Proposed Depth/Form:9353 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/24/2006
Spud Date:3/7/2006Spud Date Is:ACTUAL
Measured TD:8150 ft.Measured PB depth:
True Vertical TD:7636 ft.True Vertical PB depth:
Top PZ Location:Sec:5 Twp: 6S 96WFootage: 671 FSL  1694 FEL
Bottom Hole Location:Sec:5 Twp: 6S 96WFootage: 671 FSL  1694 FEL
Log Types:RSAT/GR/CCL, CBL/TEMP/CCL, MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 18 ft., Depth: 2534 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 0 ft., Bottom: 2550 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8135 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1555, Top: 0 ft., Bottom: 8150 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
MESAVERDE5143 ft.NN
CAMEO7550 ft.NN
ROLLINS8070 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 4/1/2025                  Interval Top: 5100 ft.    Interval Bottom: 7865 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:6/30/2006Choke Size:16.000 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/16/2006
Treatment Summary:TOTAL OF 8 STAGES: 1,095,524 GAL CLEAN FLUID & 1,082,262 LBS 20/40 JORDAN UNIMIN & 4179 GAL HCL
Tubing Size:2.375 in.Tubing Setting Depth:7383 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/22/2006Test Method:FLOWING
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BTU_GAS 964
CALC_BBLS_H2O 144
CALC_MCF_GAS 1800
CASING_PRESS 1750
MCF_GAS 75
TUBING_PRESS 1450
Perforation Data:
Interval Top:5100 ft.# Of Holes:5530
Interval Bottom:7865 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)60
Total Gas Produced (MCF)10333
GOR172216
GOR DeterminationMCFE
Average BOE per Day5.018
Average MCFE per Day29.100

 Federal Financial Assurance  i 

 Tribal Well  i No