Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11253
Well Classification: GW Status: PR - 7/21/2006
Well Name/No:N. PARACHUTE #EF01D I30 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/21/2006
FacilityID:280440LocationID:335588
County:GARFIELD #045Location:NESE 30 5S95W 6
Field:GRAND VALLEY - #31290Elevation:5989 ft.
Basin:PICEANCE BASIN  
Planned Location:1895FSL  505 FELLat/Long: 39.582697 / -108.089197Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.582756 / -108.089150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/21/2006             Measured TD: 10030 ft.    Vertical TD: 9446 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/21/2006
Wellbore PermitDIRECTIONAL
Permit #:20052677 Expiration Date:10/3/2006
Proposed Top PZ Location:Sec:30 Twp: 5S 95W Footage: 966 FNL  241 FEL
Bottom Hole Location:Sec:30 Twp: 5S 95W Footage: 966 FNL  241 FEL
Proposed Depth/Form:10555 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/9/2005
Spud Date:11/16/2005Spud Date Is:ACTUAL
Measured TD:10030 ft.Measured PB depth:9972 ft.
True Vertical TD:9446 ft.True Vertical PB depth:9388 ft.
Top PZ Location:Sec:30 Twp: 5S 95WFootage: 966 FNL  241 FEL
Bottom Hole Location:Sec:30 Twp: 5S 95WFootage: 966 FNL  241 FEL
Log Types:ARRAY INDUCTION,DUAL NEUTRON,CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: 120 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2525 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 0 ft., Bottom: 2525 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10019 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1935, Top: 2500 ft., Bottom: 10030 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6244 ft.9842 ft.NN
ROLLINS9842 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/21/2006                 Interval Top: 6370 ft.    Interval Bottom: 9751 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:7/14/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/18/2006
Treatment Summary:STAGES 01-09 TREATED W/44337 BBL SLICKWATER, 1403959 LBS 20-40 SAND. 180 BBLS 15% HCL
Tubing Size:2.375 in.Tubing Setting Depth:8603 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/21/2006Test Method:
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 1937
CASING_PRESS 52
MCF_GAS 1937
TUBING_PRESS 61
Perforation Data:
Interval Top:6370 ft.# Of Holes:189
Interval Bottom:9751 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)4551
GOR189625
GOR DeterminationMCFE
Average BOE per Day2.210
Average MCFE per Day12.830

 Federal Financial Assurance  i 

 Tribal Well  i No