Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11233
Well Classification: GW Status: PR - 4/12/2006
Well Name/No:PUCKETT/TOSCO #PA 543-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/12/2006
FacilityID:280291LocationID:428684
County:GARFIELD #045Location:NESE 34 6S95W 6
Field:PARACHUTE - #67350Elevation:5173 ft.
Basin:PICEANCE BASIN  
Planned Location:2036FSL  967 FELLat/Long: 39.479429 / -107.978772Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.479170 / -107.978650Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/12/2006             Measured TD: 7180 ft.    Vertical TD: 7126 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/12/2006
Wellbore PermitDIRECTIONAL
Permit #:20053009 Expiration Date:9/27/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1676 FSL  370 FEL
Bottom Hole Location:Sec: Twp: Footage: 1676 FSL  370 FEL
Proposed Depth/Form:7236 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:2/14/2006
Spud Date:2/2/2006Spud Date Is:ACTUAL
Measured TD:7180 ft.Measured PB depth:7108 ft.
True Vertical TD:7126 ft.True Vertical PB depth:
Top PZ Location:Sec:34 Twp: 6S 95WFootage: 1711 FSL  374 FEL
Bottom Hole Location:Sec:34 Twp: 6S 95WFootage: 1711 FSL  374 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1693 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 458, Top: 0 ft., Bottom: 1693 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7164 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 864, Top: 3260 ft., Bottom: 7164 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1475 ft.NN
FORT UNION1792 ft.NN
MESAVERDE3730 ft.NN
CAMEO6423 ft.NN
ROLLINS7084 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/12/2006                 Interval Top: 4860 ft.    Interval Bottom: 6824 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/1/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/28/2006
Treatment Summary:2,672 GALS 7.5% HCL; 603,400# 30/50 SAND; 14,806 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6598 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/12/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 112100
CALC_MCF_GAS 1121
CASING_PRESS 791
TUBING_PRESS 596
Perforation Data:
Interval Top:4860 ft.# Of Holes:106
Interval Bottom:6824 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)10451
GOR803923
GOR DeterminationMCFE
Average BOE per Day4.973
Average MCFE per Day28.848

 Federal Financial Assurance  i 

 Tribal Well  i No