Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11231
Well Classification: GW Status: PR - 3/13/2006
Well Name/No:PUCKETT/TOSCO #PA 433-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/13/2006
FacilityID:280290LocationID:334570
County:GARFIELD #045Location:NESW 34 6S95W 6
Field:PARACHUTE - #67350Elevation:5167 ft.
Basin:PICEANCE BASIN  
Planned Location:1901FSL  2530 FWLLat/Long: 39.479039 / -107.984863Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.478710 / -107.984770Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/13/2006             Measured TD: 7147 ft.    Vertical TD: 7030 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/13/2006
Wellbore PermitDIRECTIONAL
Permit #:20053005 Expiration Date:9/27/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1395 FL  1821 FEL
Bottom Hole Location:Sec: Twp: Footage: 1395 FSL  1821 FEL
Proposed Depth/Form:7194 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:1/20/2006
Spud Date:1/8/2006Spud Date Is:ACTUAL
Measured TD:7147 ft.Measured PB depth:7069 ft.
True Vertical TD:7030 ft.True Vertical PB depth:
Top PZ Location:Sec:34 Twp: 6S 95WFootage: 1432 FSL  1816 FEL
Bottom Hole Location:Sec:34 Twp: 6S 95WFootage: 1432 FSL  1816 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1659 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 435, Top: 0 ft., Bottom: 1659 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7109 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 936, Top: 2715 ft., Bottom: 7109 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1417 ft.NN
FORT UNION1702 ft.NN
MESAVERDE3690 ft.NN
CAMEO6364 ft.NN
ROLLINS7033 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/13/2006                 Interval Top: 4914 ft.    Interval Bottom: 6949 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/7/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/1/2006
Treatment Summary:2245 GALS 10% ACETIC ACID, 1496 GALS 7.5% HCL; 622295# 30/50 SAND; 18249 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6581 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/13/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1356
CASING_PRESS 1738
TUBING_PRESS 1555
Perforation Data:
Interval Top:4914 ft.# Of Holes:122
Interval Bottom:6949 ft.Hole Size:0.8095238 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7738
GOR703454
GOR DeterminationMCFE
Average BOE per Day3.688
Average MCFE per Day21.380

 Federal Financial Assurance  i 

 Tribal Well  i No