Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11230
Well Classification: GW Status: PR - 3/10/2006
Well Name/No:PUCKET/TOSCO #PA 533-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/10/2006
FacilityID:280278LocationID:334570
County:GARFIELD #045Location:NESW 34 6S95W 6
Field:PARACHUTE - #67350Elevation:5167 ft.
Basin:PICEANCE BASIN  
Planned Location:1914FSL  2529 FWLLat/Long: 39.479079 / -107.984863Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.478671 / -107.984770Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/10/2006             Measured TD: 7129 ft.    Vertical TD: 7117 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/10/2006
Wellbore PermitDIRECTIONAL
Permit #:20053004 Expiration Date:9/27/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2103 FSL  2486 FEL
Bottom Hole Location:Sec: Twp: Footage: 2103 FSL  2486 FEL
Proposed Depth/Form:7159 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:1/7/2006
Spud Date:12/30/2005Spud Date Is:ACTUAL
Measured TD:7129 ft.Measured PB depth:7064 ft.
True Vertical TD:7117 ft.True Vertical PB depth:
Top PZ Location:Sec:34 Twp: 6S 95WFootage: 2120 FSL  2488 FEL
Bottom Hole Location:Sec:34 Twp: 6S 95WFootage: 2120 FSL  2488 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1580 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 1580 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7108 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 985, Top: 2200 ft., Bottom: 7108 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1388 ft.NN
FORT UNION1667 ft.NN
MESAVERDE3602 ft.NN
CAMEO6272 ft.NN
ROLLINS6962 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/10/2006                 Interval Top: 4850 ft.    Interval Bottom: 6860 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/7/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/1/2006
Treatment Summary:3276 GALS 10% ACETIC ACID, 1522 GALS 7.5%; 819700# 30/50 SAND; 19255 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6584 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/10/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 804
CASING_PRESS 1797
TUBING_PRESS 1613
Perforation Data:
Interval Top:4850 ft.# Of Holes:125
Interval Bottom:6860 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)18
Total Gas Produced (MCF)14167
GOR787055
GOR DeterminationMCFE
Average BOE per Day6.739
Average MCFE per Day39.119

 Federal Financial Assurance  i 

 Tribal Well  i No