Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11229
Well Classification: GW Status: PR - 2/13/2006
Well Name/No:PUCKETT/TOSCO #PA 41-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/13/2006
FacilityID:280276LocationID:335061
County:GARFIELD #045Location:NENE 35 6S95W 6
Field:PARACHUTE - #67350Elevation:5162 ft.
Basin:PICEANCE BASIN  
Planned Location:235FNL  1145 FELLat/Long: 39.487919 / -107.960312Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.487899 / -107.960318Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/13/2006             Measured TD: 7809 ft.    Vertical TD: 7775 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/13/2006
Wellbore PermitDIRECTIONAL
Permit #:20053006 Expiration Date:9/27/2006
Proposed Top PZ Location:Sec: Twp: Footage: 294 FNL  561 FEL
Bottom Hole Location:Sec: Twp: Footage: 294 FNL  561 FEL
Proposed Depth/Form:7837 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:12/30/2005
Spud Date:12/17/2005Spud Date Is:ACTUAL
Measured TD:7809 ft.Measured PB depth:7761 ft.
True Vertical TD:7775 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 95WFootage: 267 FNL  570 FEL
Bottom Hole Location:Sec:35 Twp: 6S 95WFootage: 267 FNL  570 FEL
Log Types:CBL; HIGH RES. INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2070 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 553, Top: 0 ft., Bottom: 2070 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7797 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 885, Top: 3240 ft., Bottom: 7797 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1854 ft.NN
FORT UNION2155 ft.NN
MESAVERDE4156 ft.NN
CAMEO6934 ft.NN
ROLLINS7593 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/13/2006                 Interval Top: 5576 ft.    Interval Bottom: 7553 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/15/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/11/2006
Treatment Summary:3250 GALS 10% ACETIC ACID; 1489 GALS 7 1/2% HCL; 712,700# 30/50 SAND; 17,483 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7274 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/13/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 121600
CALC_MCF_GAS 1216
CASING_PRESS 1585
MCF_GAS 1216
TUBING_PRESS 1362
Perforation Data:
Interval Top:5576 ft.# Of Holes:117
Interval Bottom:7553 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7194
GOR654000
GOR DeterminationMCFE
Average BOE per Day3.428
Average MCFE per Day19.895

 Federal Financial Assurance  i 

 Tribal Well  i No