|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: PA - 6/15/2012 Measured TD: 9185 ft. Vertical TD: 9175 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: DSPW PA - 6/15/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20075507 | Expiration Date: | 10/2/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2614 FNL 756 FEL | | Bottom Hole Location: | Sec:2 Twp: 8S 93W | Footage: 2614 FNL 756 FEL | | Proposed Depth/Form: | 9185 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | MIDDLETON CREEK | Unit Number: | COC 68997X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 40 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 4, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1539 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 1015, Top: 0 ft., Bottom: 1539 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 7865 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: 3584 ft., Bottom: 7865 ft. | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 3.5 in., Top: , Depth: 9185 ft., Weight: 9.3 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 7300 ft., Bottom: 9185 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/22/2006 | | Spud Date: | 11/17/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 9185 ft. | Measured PB depth: | 7845 ft. | | True Vertical TD: | 9175 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 2614 FNL 756 FEL | | Bottom Hole Location: | Sec:2 Twp: 8S 93W | Footage: 2614 FNL 756 FEL | | Log Types: | CBL, SLIM PEX-AI/GR/SP, PEX-AI/GR/SP | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: , Depth: 40 ft., Weight: 45 , Citings Type: ACTUAL | | Cement: | Sacks: 90, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1539 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 1015, Top: 0 ft., Bottom: 1539 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 7817 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 3584 ft., Bottom: 7817 ft., Determination Method: CBL | | Casing: | String Type: OPEN HOLE, Hole Size: 4.75 in., Size: , Top: , Depth: 9185 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: 9185 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 0 ft. | 6301 ft. | N | N | | WILLIAMS FORK | 6302 ft. | 9158 ft. | N | N | | ROLLINS | 9159 ft. | | N | N |
Formation WMFK Formation Classification: OW Status: AB - 6/15/2012 Interval Top: 6302 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/22/2006 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
Formation WSTC Formation Classification: OW Status: AB - 6/15/2012 Interval Top: 4108 ft. Interval Bottom: 4962 ft.| Completed Information for Formation WASATCH | | 1st Production Date: | 10/22/2009 | Choke Size: | | | Formation Name: | WASATCH | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/19/2008 | | Treatment Summary: | STAGES 01 TREATED WITH A TOTAL OF 302 BBLS OF SLICKWATER, 2000 LBS SALT. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4056 ft. | | Tubing Packer Depth: | 4061 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WSTC. |
| | Perforation Data: | | Interval Top: | 4108 ft. | # Of Holes: | 516 | | Interval Bottom: | 4962 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/15/2012 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|