Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11205
Well Classification: GW Status: PR - 6/8/2006
Well Name/No:CLOUGH #RWF 33-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/8/2006
FacilityID:280122LocationID:335065
County:GARFIELD #045Location:NESE 14 6S94W 6
Field:RULISON - #75400Elevation:5296 ft.
Basin:PICEANCE BASIN  
Planned Location:1315FSL  1258 FELLat/Long: 39.521539 / -107.850879Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.521640 / -107.850814Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/8/2006             Measured TD: 8180 ft.    Vertical TD: 8076 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/8/2006
Wellbore PermitDIRECTIONAL
Permit #:20062881 Expiration Date:8/10/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2046 FSL  1961 FEL
Bottom Hole Location:Sec: Twp: Footage: 2046 FSL  1961 FEL
Proposed Depth/Form:8180 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 495-3&510-, Unit Acreage: 20, Drill Unit: E2

Wellbore Completed
Completion Date:3/11/2007
Spud Date:2/27/2007Spud Date Is:ACTUAL
Measured TD:8180 ft.Measured PB depth:8124 ft.
True Vertical TD:8076 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 6S 94WFootage: 2038 FSL  1978 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94WFootage: 2038 FSL  1978 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1971 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 0 ft., Bottom: 1971 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8156 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1167, Top: 3982 ft., Bottom: 8156 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1703 ft.NN
WILLIAMS FORK4262 ft.NN
CAMEO7263 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/2/2007                  Interval Top: 5872 ft.    Interval Bottom: 7942 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/20/2007Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/16/2007
Treatment Summary:4000 GALS 7 1/2% HCL; 740700# 20/40 SAND; 20736 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:7609 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/2/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 2288
MCF_GAS 1004
TUBING_PRESS 2064
Perforation Data:
Interval Top:5872 ft.# Of Holes:136
Interval Bottom:7942 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)13336
GOR476285
GOR DeterminationMCFE
Average BOE per Day6.377
Average MCFE per Day36.976

 Federal Financial Assurance  i 

 Tribal Well  i No