Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11193
Well Classification: GW Status: PR - 7/20/2006
Well Name/No:PUCKETT/TOSCO #PA 442-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/20/2006
FacilityID:280109LocationID:335060
County:GARFIELD #045Location:SENE 34 6S95W 6
Field:PARACHUTE - #67350Elevation:5212 ft.
Basin:PICEANCE BASIN  
Planned Location:2161FNL  612 FELLat/Long: 39.482479 / -107.977512Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.482522 / -107.977451Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/20/2006             Measured TD: 7438 ft.    Vertical TD: 7412 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/20/2006
Wellbore PermitDIRECTIONAL
Permit #:20063717 Expiration Date:9/13/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2215 FNL  120 FEL
Bottom Hole Location:Sec: Twp: Footage: 2215 FNL  120 FEL
Proposed Depth/Form:7425 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: N2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.

Wellbore Completed
Completion Date:8/14/2006
Spud Date:8/5/2006Spud Date Is:ACTUAL
Measured TD:7438 ft.Measured PB depth:7396 ft.
True Vertical TD:7412 ft.True Vertical PB depth:
Top PZ Location:Sec:34 Twp: 7S 95WFootage: 2195 FNL  125 FEL
Bottom Hole Location:Sec:34 Twp: 7S 95WFootage: 2195 FNL  125 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1812 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 1812 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7424 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1028, Top: 2080 ft., Bottom: 7424 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1614 ft.NN
FORT UNION1914 ft.NN
MESAVERDE3883 ft.NN
CAMEO6597 ft.NN
ROLLINS7296 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/22/2006                Interval Top: 5220 ft.    Interval Bottom: 7215 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/20/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/19/2006
Treatment Summary:4515 GALS 7 1/2% HCL; 751,900# 30/50 SAND; 21,777 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6772 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1716
MCF_GAS 1433
TUBING_PRESS 1570
Perforation Data:
Interval Top:5220 ft.# Of Holes:167
Interval Bottom:7215 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)14116
GOR830352
GOR DeterminationMCFE
Average BOE per Day6.713
Average MCFE per Day38.971

 Federal Financial Assurance  i 

 Tribal Well  i No