Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11187
Well Classification: GW Status: PR - 9/9/2007
Well Name/No:CLOUGH #RWF 334-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/9/2007
FacilityID:280102LocationID:335064
County:GARFIELD #045Location:SWSE 15 6S94W 6
Field:RULISON - #75400Elevation:5566 ft.
Basin:PICEANCE BASIN  
Planned Location:1055FSL  1510 FELLat/Long: 39.520829 / -107.870460Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.520862 / -107.870387Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/9/2007             Measured TD: 8325 ft.    Vertical TD: 8306 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/9/2007
Wellbore PermitDIRECTIONAL
Permit #:20062862 Expiration Date:8/16/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1035 FSL  1937 FEL
Bottom Hole Location:Sec: Twp: Footage: 1035 FSL  1937 FEL
Proposed Depth/Form:8211 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-41 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:4/21/2007
Spud Date:4/2/2007Spud Date Is:ACTUAL
Measured TD:8325 ft.Measured PB depth:8300 ft.
True Vertical TD:8306 ft.True Vertical PB depth:8281 ft.
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 1025 FSL  1934 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 1025 FSL  1934 FEL
Log Types:CBL,IND/DENS/NEU, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1160 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1160 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8306 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1053, Top: 3600 ft., Bottom: 8306 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1951 ft.NN
WILLIAMS FORK4481 ft.NN
CAMEO7284 ft.NN
ROLLINS8237 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/9/2007                  Interval Top: 5899 ft.    Interval Bottom: 7689 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/21/2007Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2007
Treatment Summary:3500 GALS 7.5% HCL; 766,300# 20/40 SAND; 21,203 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7475 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/9/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1095
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1124
CASING_PRESS 1923
MCF_GAS 1124
TUBING_PRESS 1797
Perforation Data:
Interval Top:5899 ft.# Of Holes:130
Interval Bottom:7689 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)9432
GOR410086
GOR DeterminationMCFE
Average BOE per Day4.519
Average MCFE per Day26.224

 Federal Financial Assurance  i 

 Tribal Well  i No