Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11184
Well Classification: GW Status: PR - 6/8/2006
Well Name/No:CLOUGH #RFW 344-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/8/2006
FacilityID:280099LocationID:335064
County:GARFIELD #045Location:SWSE 15 6S94W 6
Field:RULISON - #75400Elevation:5566 ft.
Basin:PICEANCE BASIN  
Planned Location:1057FSL  1500 FELLat/Long: 39.520829 / -107.870420Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.520868 / -107.870352Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/8/2006             Measured TD: 8429 ft.    Vertical TD: 8360 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/8/2006
Wellbore PermitDIRECTIONAL
Permit #:20062861 Expiration Date:8/16/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1236 FSL  685 FEL
Bottom Hole Location:Sec: Twp: Footage: 1236 FSL  685 FEL
Proposed Depth/Form:8293 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-41 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:5/6/2007
Spud Date:4/22/2007Spud Date Is:ACTUAL
Measured TD:8429 ft.Measured PB depth:8276 ft.
True Vertical TD:8360 ft.True Vertical PB depth:
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 1238 FSL  683 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 1238 FSL  683 FEL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1141 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1141 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8411 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1052, Top: 3480 ft., Bottom: 8411 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1924 ft.NN
WILLIAMS FORK4470 ft.NN
CAMEO7345 ft.NN
ROLLINS8263 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/9/2007                  Interval Top: 5900 ft.    Interval Bottom: 8230 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/25/2007Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2007
Treatment Summary:4000 GALS 7.5% HCL; 855,500# 20/40 SAND; 23,313 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7721 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/9/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1130
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1898
MCF_GAS 1465
TUBING_PRESS 1780
Perforation Data:
Interval Top:5900 ft.# Of Holes:147
Interval Bottom:8230 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)55
Total Gas Produced (MCF)20864
GOR379345
GOR DeterminationMCFE
Average BOE per Day10.005
Average MCFE per Day58.024

 Federal Financial Assurance  i 

 Tribal Well  i No