Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11177
Well Classification: GW Status: PR - 4/24/2007
Well Name/No:CLOUGH #RMV 140-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/24/2007
FacilityID:280090LocationID:335064
County:GARFIELD #045Location:SWSE 15 6S94W 6
Field:RULISON - #75400Elevation:5567 ft.
Basin:PICEANCE BASIN  
Planned Location:1033FSL  1505 FELLat/Long: 39.520769 / -107.870402Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.520800 / -107.870368Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/24/2007             Measured TD: 8352 ft.    Vertical TD: 8293 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/24/2007
Wellbore PermitDIRECTIONAL
Permit #:20072223 Expiration Date:5/17/2008
Proposed Top PZ Location:Sec: Twp: Footage: 443 FSL  2009 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94W Footage: 443 FSL  2009 FEL
Proposed Depth/Form:8225 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-41 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:6/20/2007
Spud Date:6/5/2007Spud Date Is:ACTUAL
Measured TD:8352 ft.Measured PB depth:8280 ft.
True Vertical TD:8293 ft.True Vertical PB depth:
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 458 FSL  2020 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 458 FSL  2020 FEL
Log Types:CBL; HIGH RES.IND.,SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1142 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1142 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8335 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1043, Top: 3600 ft., Bottom: 8335 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1943 ft.NN
WILLIAMS FORK4487 ft.NN
CAMEO7288 ft.NN
ROLLINS8236 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/22/2007                 Interval Top: 5919 ft.    Interval Bottom: 8173 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/21/2007Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/19/2007
Treatment Summary:3500 GALS 7.5% HCL; 1,673,100# 20/40 SAND; 43,723 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7717 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/22/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1074
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 2076
MCF_GAS 1144
TUBING_PRESS 1777
Perforation Data:
Interval Top:5919 ft.# Of Holes:148
Interval Bottom:8173 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)55
Total Gas Produced (MCF)24530
GOR446000
GOR DeterminationMCFE
Average BOE per Day11.736
Average MCFE per Day68.085

 Federal Financial Assurance  i 

 Tribal Well  i No