Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11157
Well Classification: GW Status: PR - 9/13/2005
Well Name/No:PUCKETT/TOSCO #PA 432-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/13/2005
FacilityID:279999LocationID:335060
County:GARFIELD #045Location:SENE 34 6S95W 6
Field:PARACHUTE - #67350Elevation:5212 ft.
Basin:PICEANCE BASIN  
Planned Location:2137FNL  667 FELLat/Long: 39.482519 / -107.978332Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.482600 / -107.977660Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/10/2005             Measured TD: 7422 ft.    Vertical TD: 7332 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/10/2005
Wellbore PermitDIRECTIONAL
Permit #:20052890 Expiration Date:9/12/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1862 FNL  1533 FEL
Bottom Hole Location:Sec: Twp: Footage: 1862 FNL  1533 FEL
Proposed Depth/Form:7450 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.

Wellbore Completed
Completion Date:5/8/2006
Spud Date:4/19/2006Spud Date Is:ACTUAL
Measured TD:7422 ft.Measured PB depth:7400 ft.
True Vertical TD:7332 ft.True Vertical PB depth:
Top PZ Location:Sec:34 Twp: 6S 95WFootage: 1869 FNL  1543 FEL
Bottom Hole Location:Sec:34 Twp: 6S 95WFootage: 1869 FNL  1543 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1840 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 1840 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7462 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 903, Top: 2850 ft., Bottom: 7462 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1627 ft.NN
FORT UNION1904 ft.NN
MESAVERDE3885 ft.NN
CAMEO6555 ft.NN
ROLLINS7285 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/21/2006                 Interval Top: 5118 ft.    Interval Bottom: 7190 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/11/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/10/2006
Treatment Summary:3575 GALS 7 1/2% HCL; 760,000# 30/50 SAND; 18,851 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6550 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/21/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1325
MCF_GAS 1000
TUBING_PRESS 1100
Perforation Data:
Interval Top:5118 ft.# Of Holes:141
Interval Bottom:7190 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)15668
GOR824631
GOR DeterminationMCFE
Average BOE per Day7.456
Average MCFE per Day43.248

 Federal Financial Assurance  i 

 Tribal Well  i No