Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11154
Well Classification: GW Status: PR - 8/1/2014
Well Name/No:CLOUGH #RWF 532-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2014
FacilityID:280019LocationID:335572
County:GARFIELD #045Location:NWNE 15 6S94W 6
Field:RULISON - #75400Elevation:5666 ft.
Basin:PICEANCE BASIN  
Planned Location:939FNL  1970 FELLat/Long: 39.529809 / -107.872010Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.529928 / -107.871989Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2014             Measured TD: 8581 ft.    Vertical TD: 8556 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2014
Wellbore PermitDIRECTIONAL
Permit #:20062901 Expiration Date:8/16/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1373 FNL  2012 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94W Footage: 1373 FNL  2012 FEL
Proposed Depth/Form:8595 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-41 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:11/13/2006
Spud Date:10/28/2006Spud Date Is:ACTUAL
Measured TD:8581 ft.Measured PB depth:8501 ft.
True Vertical TD:8556 ft.True Vertical PB depth:
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 1368 FNL  2003 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 1368 FNL  2003 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1152 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 1152 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8562 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1073, Top: 3250 ft., Bottom: 8562 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2118 ft.NN
MESAVERDE4674 ft.NN
CAMEO7473 ft.NN
ROLLINS8504 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/1/2014                  Interval Top: 6228 ft.    Interval Bottom: 8353 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/7/2006Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/4/2006
Treatment Summary:2022 GAL 7 1/2% HCL; 662500# 20/40 SAND; 16562 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7743 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/26/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 2258
MCF_GAS 917
TUBING_PRESS 1968
Perforation Data:
Interval Top:6228 ft.# Of Holes:116
Interval Bottom:8353 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)9281
GOR545941
GOR DeterminationMCFE
Average BOE per Day4.428
Average MCFE per Day25.713

 Federal Financial Assurance  i 

 Tribal Well  i No