Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11145
Well Classification: GW Status: PR - 9/13/2005
Well Name/No:CLOUGH #RWF 431-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/13/2005
FacilityID:280010LocationID:311629
County:GARFIELD #045Location:SWNE 16 6S94W 6
Field:RULISON - #75400Elevation:5966 ft.
Basin:PICEANCE BASIN  
Planned Location:1603FNL  1937 FELLat/Long: 39.527929 / -107.891420Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.528044 / -107.890671Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/4/2005             Measured TD: 8725 ft.    Vertical TD: 8632 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/4/2005
Wellbore PermitDIRECTIONAL
Permit #:20052819 Expiration Date:9/12/2006
Proposed Top PZ Location:Sec:16 Twp: 6S 94W Footage: 589 FNL  2053 FEL
Bottom Hole Location:Sec:16 Twp: 6S 94W Footage: 589 FNL  2053 FEL
Proposed Depth/Form:8706 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:8/13/2006
Spud Date:7/24/2006Spud Date Is:ACTUAL
Measured TD:8725 ft.Measured PB depth:8300 ft.
True Vertical TD:8632 ft.True Vertical PB depth:
Top PZ Location:Sec:16 Twp: 6S 94WFootage: 589 FNL  2047 FEL
Bottom Hole Location:Sec:16 Twp: 6S 94WFootage: 589 FNL  2047 FEL
Log Types:CBL; RESERVOR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2680 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 2680 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8692 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 996, Top: 2910 ft., Bottom: 8692 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4235 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 3383 ft., Bottom: 4235 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH2401 ft.NN
MESAVERDE4972 ft.NN
CAMEO7842 ft.NN
ROLLINS8749 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/2/2007                  Interval Top: 6442 ft.    Interval Bottom: 8177 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/25/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/24/2006
Treatment Summary:5250 GALS 7 1/2% HCL; 686,000# 20/40 SAND; 19,461 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7597 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/2/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1297
MCF_GAS 1135
TUBING_PRESS 1137
Perforation Data:
Interval Top:6442 ft.# Of Holes:136
Interval Bottom:8177 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)61
Total Gas Produced (MCF)14600
GOR239344
GOR DeterminationMCFE
Average BOE per Day7.059
Average MCFE per Day40.949

 Federal Financial Assurance  i 

 Tribal Well  i No