Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11140
Well Classification: GW Status: PR - 9/12/2006
Well Name/No:CLOUGH #RWF 342-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/12/2006
FacilityID:280005LocationID:335572
County:GARFIELD #045Location:NWNE 15 6S94W 6
Field:RULISON - #75400Elevation:5666 ft.
Basin:PICEANCE BASIN  
Planned Location:908FNL  1936 FELLat/Long: 39.529879 / -107.872510Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.530016 / -107.871870Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/12/2006             Measured TD: 8750 ft.    Vertical TD: 8616 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/12/2006
Wellbore PermitDIRECTIONAL
Permit #:20052808 Expiration Date:9/12/2006
Proposed Top PZ Location:Sec:15 Twp: 6S 94W Footage: 1544 FNL  623 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94W Footage: 1544 FNL  623 FEL
Proposed Depth/Form:
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:6/5/2006
Spud Date:4/30/2006Spud Date Is:ACTUAL
Measured TD:8750 ft.Measured PB depth:8660 ft.
True Vertical TD:8616 ft.True Vertical PB depth:
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 1530 FNL  627 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 1530 FNL  627 FEL
Log Types:CBL; HIGH RES INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2419 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 452, Top: 0 ft., Bottom: 2419 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8731 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1035, Top: 3500 ft., Bottom: 8731 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2118 ft.NN
MESAVERDE4882 ft.NN
CAMEO7658 ft.NN
ROLLINS8620 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/12/2006                 Interval Top: 6318 ft.    Interval Bottom: 8589 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/30/2006Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/28/2006
Treatment Summary:2986 GALS 7 1/2% HCL; 715,100# 20/40 SAND; 17683 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7849 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/12/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 657
CASING_PRESS 901
MCF_GAS 657
Perforation Data:
Interval Top:6318 ft.# Of Holes:119
Interval Bottom:8589 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)7444
GOR620333
GOR DeterminationMCFE
Average BOE per Day3.548
Average MCFE per Day20.594

 Federal Financial Assurance  i 

 Tribal Well  i No