Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11140
Well Classification: GW Status: PR - 9/12/2006
Well Name/No:CLOUGH #RWF 342-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/12/2006
FacilityID:280005LocationID:335572
County:GARFIELD #045Location:NWNE 15 6S94W 6
Field:RULISON - #75400Elevation:5666 ft.
Basin:PICEANCE BASIN  
Planned Location:908FNL  1936 FELLat/Long: 39.529879 / -107.872510Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.530016 / -107.871870Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/12/2006             Measured TD: 8750 ft.    Vertical TD: 8616 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/12/2006
Wellbore PermitDIRECTIONAL
Permit #:20052808 Expiration Date:9/12/2006
Proposed Top PZ Location:Sec:15 Twp: 6S 94W Footage: 1544 FNL  623 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94W Footage: 1544 FNL  623 FEL
Proposed Depth/Form:
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:6/5/2006
Spud Date:4/30/2006Spud Date Is:ACTUAL
Measured TD:8750 ft.Measured PB depth:8660 ft.
True Vertical TD:8616 ft.True Vertical PB depth:
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 1530 FNL  627 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 1530 FNL  627 FEL
Log Types:CBL; HIGH RES INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2419 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 452, Top: 0 ft., Bottom: 2419 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8731 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1035, Top: 3500 ft., Bottom: 8731 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2118 ft.NN
MESAVERDE4882 ft.NN
CAMEO7658 ft.NN
ROLLINS8620 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/12/2006                 Interval Top: 6318 ft.    Interval Bottom: 8589 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/30/2006Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/28/2006
Treatment Summary:2986 GALS 7 1/2% HCL; 715,100# 20/40 SAND; 17683 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7849 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/12/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 657
CASING_PRESS 901
MCF_GAS 657
Perforation Data:
Interval Top:6318 ft.# Of Holes:119
Interval Bottom:8589 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)7224
GOR602000
GOR DeterminationMCFE
Average BOE per Day3.448
Average MCFE per Day19.995

 Federal Financial Assurance  i 

 Tribal Well  i No