Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11113
Well Classification: CBM Status: PR - 8/8/2006
Well Name/No:CLOUGH #RWF 511-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/8/2006
FacilityID:279928LocationID:335571
County:GARFIELD #045Location:SWNW 15 6S94W 6
Field:RULISON - #75400Elevation:5769 ft.
Basin:PICEANCE BASIN  
Planned Location:1541FNL  1261 FWLLat/Long: 39.528129 / -107.879460Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.528237 / -107.879337Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/8/2006             Measured TD: 8665 ft.    Vertical TD: 8604 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/8/2006
Wellbore PermitDIRECTIONAL
Permit #:20064053 Expiration Date:9/24/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1082 FNL  620 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94W Footage: 1082 FNL  620 FWL
Proposed Depth/Form:8700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:10/28/2006
Spud Date:10/11/2006Spud Date Is:ACTUAL
Measured TD:8665 ft.Measured PB depth:8561 ft.
True Vertical TD:8604 ft.True Vertical PB depth:
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 1078 FNL  577 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 1078 FNL  577 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1142 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 1141 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8614 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1214, Top: 3780 ft., Bottom: 8614 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3959 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 3058 ft., Bottom: 3959 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH G2221 ft.NN
MESAVERDE4766 ft.NN
CAMEO7580 ft.NN
ROLLINS8591 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/7/2007                  Interval Top: 6305 ft.    Interval Bottom: 8386 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/21/2007Choke Size:0.266 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2007
Treatment Summary:2500 GALS 7 1/2% HCL; 573900 # 20/40 SAND; 15236 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7872 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/7/2007Test Method:FLOWING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 924
MCF_GAS 1126
TUBING_PRESS 927
Perforation Data:
Interval Top:6305 ft.# Of Holes:112
Interval Bottom:8386 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)12987
GOR447827
GOR DeterminationMCFE
Average BOE per Day6.214
Average MCFE per Day36.059

 Federal Financial Assurance  i 

 Tribal Well  i No