Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11103
Well Classification: GW Status: PR - 4/1/2023
Well Name/No:CLOUGH #RWF 541-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC35842
Facility Status:PRStatus Date4/1/2023
FacilityID:279908LocationID:335160
County:GARFIELD #045Location:SWSE 16 6S94W 6
Field:RULISON - #75400Elevation:5453 ft.
Basin:PICEANCE BASIN  
Planned Location:418FSL  1698 FELLat/Long: 39.519241 / -107.889978Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.519317 / -107.890072Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2023             Measured TD: 8244 ft.    Vertical TD: 8109 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2023
Wellbore PermitDIRECTIONAL
Permit #:20072349 Expiration Date:5/29/2008
Proposed Top PZ Location:Sec: Twp: Footage: 147 FNL  668 FEL
Bottom Hole Location:Sec:21 Twp: 6S 94W Footage: 147 FNL  668 FEL
Proposed Depth/Form:8081 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:3/8/2008
Spud Date:2/25/2008Spud Date Is:ACTUAL
Measured TD:8244 ft.Measured PB depth:8180 ft.
True Vertical TD:8109 ft.True Vertical PB depth:8045 ft.
Top PZ Location:Sec:21 Twp: 6S 94WFootage: 139 FNL  662 FEL
Bottom Hole Location:Sec:21 Twp: 6S 94WFootage: 139 FNL  662 FEL
Log Types:CBL, HIGH RES. IND.,SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2086 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 2086 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8223 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1075, Top: 3190 ft., Bottom: 8223 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1825 ft.NN
MESAVERDE4392 ft.NN
CAMEO7169 ft.NN
ROLLINS8199 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2023                  Interval Top: 5755 ft.    Interval Bottom: 7868 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/2/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/20/2008
Treatment Summary:3496 GALS 7.5% HCL; 656,000# 20/40 SAND; 28,143 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7318 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/18/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1113
CASING_PRESS 833
MCF_GAS 1113
TUBING_PRESS 594
Perforation Data:
Interval Top:5755 ft.# Of Holes:140
Interval Bottom:7868 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)16414
GOR820700
GOR DeterminationMCFE
Average BOE per Day7.814
Average MCFE per Day45.347

 Federal Financial Assurance  i 

 Tribal Well  i No