Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11096
Well Classification: GW Status: PR - 4/27/2007
Well Name/No:CLOUGH #RMV 164-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC33173
Facility Status:PRStatus Date4/27/2007
FacilityID:279897LocationID:335160
County:GARFIELD #045Location:SWSE 16 6S94W 6
Field:RULISON - #75400Elevation:5453 ft.
Basin:PICEANCE BASIN  
Planned Location:424FSL  1685 FELLat/Long: 39.519258 / -107.889931Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.519332 / -107.890021Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/27/2007             Measured TD: 8261 ft.    Vertical TD: 8134 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/27/2007
Wellbore PermitDIRECTIONAL
Permit #:20072350 Expiration Date:5/29/2008
Proposed Top PZ Location:Sec: Twp: Footage: 666 FSL  660 FEL
Bottom Hole Location:Sec:16 Twp: 6S 94W Footage: 666 FSL  660 FEL
Proposed Depth/Form:8079 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:1/17/2008
Spud Date:1/5/2008Spud Date Is:ACTUAL
Measured TD:8261 ft.Measured PB depth:8160 ft.
True Vertical TD:8134 ft.True Vertical PB depth:8033 ft.
Top PZ Location:Sec:16 Twp: 6S 94WFootage: 679 FSL  639 FEL
Bottom Hole Location:Sec:16 Twp: 6S 94WFootage: 679 FSL  639 FEL
Log Types:CBL; RMTE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1169 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1169 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8240 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1087, Top: 3210 ft., Bottom: 2830 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1779 ft.NN
MESAVERDE4364 ft.NN
CAMEO7230 ft.NN
ROLLINS8186 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/4/2008                  Interval Top: 5779 ft.    Interval Bottom: 7840 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/27/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/20/2008
Treatment Summary:2,998 GALS 7.5% HCL; 722,400# 20/40 SAND; 23,524 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7224 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/4/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1135
CASING_PRESS 570
MCF_GAS 859
TUBING_PRESS 400
Perforation Data:
Interval Top:5779 ft.# Of Holes:115
Interval Bottom:7840 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)15346
GOR529172
GOR DeterminationMCFE
Average BOE per Day7.341
Average MCFE per Day42.546

 Federal Financial Assurance  i 

 Tribal Well  i No