Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11084
Well Classification: GW Status: PR - 4/27/2007
Well Name/No:CLOUGH #RWF 343-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC33173
Facility Status:PRStatus Date4/27/2007
FacilityID:279769LocationID:335160
County:GARFIELD #045Location:SWSE 16 6S94W 6
Field:RULISON - #75400Elevation:5453 ft.
Basin:PICEANCE BASIN  
Planned Location:444FSL  1661 FELLat/Long: 39.519314 / -107.889846Lat/Long Source: Calculated From Footages
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/27/2007             Measured TD: 8380 ft.    Vertical TD: 8137 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/27/2007
Wellbore PermitDIRECTIONAL
Permit #:20072357 Expiration Date:5/29/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1642 FSL  682 FEL
Bottom Hole Location:Sec:16 Twp: 6S 94W Footage: 1642 FSL  682 FEL
Proposed Depth/Form:8237 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:12/10/2007
Spud Date:11/27/2007Spud Date Is:ACTUAL
Measured TD:8380 ft.Measured PB depth:8320 ft.
True Vertical TD:8137 ft.True Vertical PB depth:8077 ft.
Top PZ Location:Sec:16 Twp: 6S 94WFootage: 1645 FSL  647 FEL
Bottom Hole Location:Sec:16 Twp: 6S 94WFootage: 1645 FSL  647 FEL
Log Types:CBL, HRI/SD/DSN, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2091 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 472, Top: 0 ft., Bottom: 2091 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8358 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1134, Top: 3280 ft., Bottom: 8358 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE4555 ft.NN
CAMEO7376 ft.NN
ROLLINS8351 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/17/2008                 Interval Top: 5983 ft.    Interval Bottom: 7919 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/10/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/2/2008
Treatment Summary:4,048 GALS 7.5% HCL; 683,900# 20/40 SAND; 21,216 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7208 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/17/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1117
CASING_PRESS 766
MCF_GAS 1053
TUBING_PRESS 587
Perforation Data:
Interval Top:5983 ft.# Of Holes:113
Interval Bottom:7919 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)32
Total Gas Produced (MCF)16942
GOR529437
GOR DeterminationMCFE
Average BOE per Day8.097
Average MCFE per Day46.958

 Federal Financial Assurance  i 

 Tribal Well  i No