Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11071
Well Classification: GW Status: PR - 6/1/2022
Well Name/No:BOSELY #SG 534-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2022
FacilityID:279730LocationID:334730
County:GARFIELD #045Location:SWSE 22 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5064 ft.
Basin:PICEANCE BASIN  
Planned Location:607FSL  1601 FELLat/Long: 39.417459 / -108.092675Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.417534 / -108.092683Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2022             Measured TD: 5279 ft.    Vertical TD: 5226 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2022
Wellbore PermitDIRECTIONAL
Permit #:20052727 Expiration Date:9/1/2006
Proposed Top PZ Location:Sec: Twp: Footage: 231 FSL  1956 FEL
Bottom Hole Location:Sec: Twp: Footage: 231 FSL  1956 FEL
Proposed Depth/Form:5230 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-14 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:4/6/2006
Spud Date:3/30/2006Spud Date Is:ACTUAL
Measured TD:5279 ft.Measured PB depth:5243 ft.
True Vertical TD:5226 ft.True Vertical PB depth:
Top PZ Location:Sec:22 Twp: 7S 96WFootage: 359 FSL  2108 FEL
Bottom Hole Location:Sec:22 Twp: 7S 96WFootage: 359 FSL  2108 FEL
Log Types:CBL; HIGH RES. IND, SPECTRAL DEN, DUAL SPACED NEUT
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1131 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1131 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5265 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 1140 ft., Bottom: 5265 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G723 ft.NN
FORT UNION1115 ft.NN
MESAVERDE2325 ft.NN
CAMEO4653 ft.NN
ROLLINS5137 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/1/2022                  Interval Top: 3687 ft.    Interval Bottom: 5098 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/12/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/8/2006
Treatment Summary:2995 GALS 7 1/2% HCL; 895600# 30/50 SAND; 20403 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:4626 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 955
CASING_PRESS 1386
TUBING_PRESS 1240
Perforation Data:
Interval Top:3687 ft.# Of Holes:117
Interval Bottom:5098 ft.Hole Size:0.35 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2
Total Gas Produced (MCF)3199
GOR1599500
GOR DeterminationMCFE
Average BOE per Day1.533
Average MCFE per Day8.899

 Federal Financial Assurance  i 

 Tribal Well  i No