Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11055
Well Classification: GW Status: PR - 6/8/2006
Well Name/No:FEDERAL #RWF 513-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/8/2006
FacilityID:279491LocationID:335655
County:GARFIELD #045Location:NESW 10 6S94W 6
Field:RULISON - #75400Elevation:5869 ft.
Basin:PICEANCE BASIN  
Planned Location:2052FSL  2248 FWLLat/Long: 39.537959 / -107.875380Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.538115 / -107.875487Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/8/2006             Measured TD: 9165 ft.    Vertical TD: 8901 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/8/2006
Wellbore PermitDIRECTIONAL
Permit #:20062884 Expiration Date:8/15/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2713 FSL  635 FWL
Bottom Hole Location:Sec: Twp: Footage: 2713 FSL  635 FWL
Proposed Depth/Form:9155 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.

Wellbore Completed
Completion Date:8/10/2006
Spud Date:7/14/2006Spud Date Is:ACTUAL
Measured TD:9165 ft.Measured PB depth:9121 ft.
True Vertical TD:8901 ft.True Vertical PB depth:
Top PZ Location:Sec:10 Twp: 6S 94WFootage: 2706 FSL  638 FWL
Bottom Hole Location:Sec:10 Twp: 6S 94WFootage: 2706 FSL  638 FWL
Log Types:CBL; HIGH RES. INDUCTION; SPECTRAL DENSITY/DUAL SPACED NEUTRON; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2749 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 717, Top: 0 ft., Bottom: 2749 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9146 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1256, Top: 3900 ft., Bottom: 9146 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2424 ft.NN
MESAVERDE5200 ft.NN
CAMEO7998 ft.NN
ROLLINS8992 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/10/2006                Interval Top: 6891 ft.    Interval Bottom: 8939 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/27/2006Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/26/2006
Treatment Summary:3521 GALS 7 1/2% HCL; 725600# 20/40 SAND; 17331 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8331 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/10/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 2349
MCF_GAS 844
TUBING_PRESS 2299
Perforation Data:
Interval Top:6891 ft.# Of Holes:131
Interval Bottom:8939 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)131
Total Gas Produced (MCF)22552
GOR172152
GOR DeterminationMCFE
Average BOE per Day11.013
Average MCFE per Day63.890

 Federal Financial Assurance  i Y

 Tribal Well  i No