Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11053
Well Classification: GW Status: PR - 1/20/2006
Well Name/No:PA #623-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/20/2006
FacilityID:279493LocationID:335292
County:GARFIELD #045Location:NESW 33 6S95W 6
Field:PARACHUTE - #67350Elevation:5231 ft.
Basin:PICEANCE BASIN  
Planned Location:2252FSL  2194 FWLLat/Long: 39.479969 / -108.004693Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.479844 / -108.004646Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/20/2006             Measured TD: 6916 ft.    Vertical TD: 6874 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/20/2006
Wellbore PermitDIRECTIONAL
Permit #:20052664 Expiration Date:8/21/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1757 FSL  2514 FWL
Bottom Hole Location:Sec: Twp: Footage: 1757 FSL  2514 FWL
Proposed Depth/Form:6996 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SW4

Wellbore Completed
Completion Date:11/27/2005
Spud Date:11/17/2005Spud Date Is:ACTUAL
Measured TD:6916 ft.Measured PB depth:6808 ft.
True Vertical TD:6874 ft.True Vertical PB depth:
Top PZ Location:Sec:33 Twp: 6S 95WFootage: 1763 FSL  2530 FWL
Bottom Hole Location:Sec:33 Twp: 6S 95WFootage: 1763 FSL  2530 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1612 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 435, Top: 0 ft., Bottom: 1612 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6912 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 883, Top: 2560 ft., Bottom: 6912 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1370 ft.NN
FORT UNION1634 ft.NN
MESAVERDE3511 ft.NN
CAMEO6158 ft.NN
ROLLINS6841 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/20/2006                 Interval Top: 4898 ft.    Interval Bottom: 6743 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/18/2005Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/16/2005
Treatment Summary:500 7.5% HCL; 4,000 GALS 10% ACETIC ACID; 676,800# 30/50 SAND; 15,947 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6560 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/20/2006Test Method:FLOWING
Hours Tested:Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1029
CASING_PRESS 1300
TUBING_PRESS 1192
Perforation Data:
Interval Top:4898 ft.# Of Holes:102
Interval Bottom:6743 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)13846
GOR602000
GOR DeterminationMCFE
Average BOE per Day6.609
Average MCFE per Day38.324

 Federal Financial Assurance  i 

 Tribal Well  i No