Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11045
Well Classification: GW Status: SI - 7/1/2025
Well Name/No:PUCKETT #241-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2025
FacilityID:279464LocationID:324333
County:GARFIELD #045Location:NENW 36 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8290 ft.
Basin:PICEANCE BASIN  
Planned Location:290FNL  2050 FWLLat/Long: 39.485978 / -108.170608Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.485958 / -108.170742Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2025             Measured TD: 8932 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2025
Wellbore Permit
Permit #:20052563 Expiration Date:8/18/2006
Proposed Depth/Form:9300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/18/2006
Spud Date:8/8/2006Spud Date Is:ACTUAL
Measured TD:8932 ft.Measured PB depth:8701 ft.
True Vertical TD:True Vertical PB depth:
Log Types:PND-S CASED HOLE TRIPLE COMBO; PULSED NEUTRON DECAY; CBL/GR; MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 32 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2523 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2523 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8701 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 3754 ft., Bottom: 8701 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4418 ft.NN
FORT UNION4709 ft.NN
WILLIAMS FORK5971 ft.NN
CAMEO8260 ft.NN
ROLLINS8700 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 7/1/2025                  Interval Top: 7068 ft.    Interval Bottom: 8380 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/2/2006Choke Size:0.188 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/19/2006
Treatment Summary:BJ SERVISES FRACED USING 15906 BBLS OF SLICKWATER GEL, 803,275# 30/50 FRAC SAND
Tubing Size:2.375 in.Tubing Setting Depth:8236 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/1/2006Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 34
BBLS_OIL 2
BTU_GAS 1082
CALC_BBLS_H2O 34
CALC_BBLS_OIL 2
CALC_GOR 689000
CALC_MCF_GAS 1378
CASING_PRESS 1950
GRAVITY_OIL 52
MCF_GAS 1378
TUBING_PRESS 1000
Perforation Data:
Interval Top:7068 ft.# Of Holes:100
Interval Bottom:8380 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)17
GOR
GOR DeterminationMCFE
Average BOE per Day0.008
Average MCFE per Day0.047

 Federal Financial Assurance  i 

 Tribal Well  i No