Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11042
Well Classification: GW Status: PR - 6/1/2006
Well Name/No:PA #513-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2006
FacilityID:279461LocationID:335073
County:GARFIELD #045Location:SESW 26 6S95W 6
Field:PARACHUTE - #67350Elevation:5522 ft.
Basin:PICEANCE BASIN  
Planned Location:588FSL  1502 FWLLat/Long: 39.490089 / -107.970052Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.490115 / -107.970124Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2006             Measured TD: 8226 ft.    Vertical TD: 8100 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2006
Wellbore PermitDIRECTIONAL
Permit #:20052557 Expiration Date:8/18/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1545 FSL  927 FWL
Bottom Hole Location:Sec: Twp: Footage: 1545 FSL  927 FWL
Proposed Depth/Form:8262 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:2/18/2006
Spud Date:1/21/2006Spud Date Is:ACTUAL
Measured TD:8226 ft.Measured PB depth:8148 ft.
True Vertical TD:8100 ft.True Vertical PB depth:
Top PZ Location:Sec:26 Twp: 6S 95WFootage: 1558 FSL  912 FWL
Bottom Hole Location:Sec:26 Twp: 6S 95WFootage: 1558 FSL  912 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2452 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 0 ft., Bottom: 2452 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8188 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1170, Top: 2730 ft., Bottom: 8188 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2237 ft.NN
FORT UNION2557 ft.NN
MESAVERDE4612 ft.NN
CAMEO7418 ft.NN
ROLLINS8114 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/1/2006                  Interval Top: 6032 ft.    Interval Bottom: 8039 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/29/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/21/2006
Treatment Summary:2,744 GALS 7.5% HCL; 802,200# # 30/50 SAND; 19,390 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5888 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1600
CASING_PRESS 1500
MCF_GAS 1600
TUBING_PRESS 1500
Perforation Data:
Interval Top:6032 ft.# Of Holes:122
Interval Bottom:8039 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)17080
GOR588965
GOR DeterminationMCFE
Average BOE per Day8.150
Average MCFE per Day47.270

 Federal Financial Assurance  i Y

 Tribal Well  i No