Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11040
Well Classification: GW Status: PR - 8/19/2005
Well Name/No:PA #13-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/19/2005
FacilityID:279459LocationID:335073
County:GARFIELD #045Location:SESW 26 6S95W 6
Field:PARACHUTE - #67350Elevation:5522 ft.
Basin:PICEANCE BASIN  
Planned Location:571FSL  1527 FWLLat/Long: 39.490039 / -107.969962Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.490079 / -107.970049Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/20/2005             Measured TD: 8583 ft.    Vertical TD: 8228 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/20/2005
Wellbore PermitDIRECTIONAL
Permit #:20052555 Expiration Date:8/18/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2426 FSL  916 FWL
Bottom Hole Location:Sec: Twp: Footage: 2426 FSL  916 FWL
Proposed Depth/Form:8575 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:3/28/2006
Spud Date:3/18/2006Spud Date Is:ACTUAL
Measured TD:8583 ft.Measured PB depth:8437 ft.
True Vertical TD:8228 ft.True Vertical PB depth:
Top PZ Location:Sec:26 Twp: 6S 95WFootage: 2415 FSL  914 FWL
Bottom Hole Location:Sec:26 Twp: 6S 95WFootage: 2415 FSL  914 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2534 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 2533 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8563 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1060, Top: 3210 ft., Bottom: 8563 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2329 ft.NN
FORT UNION2631 ft.NN
MESAVERDE4866 ft.NN
CAMEO7727 ft.NN
ROLLINS8399 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/19/2006                 Interval Top: 6573 ft.    Interval Bottom: 8329 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/6/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2006
Treatment Summary:3498 GALS 7 1/2% HCL; 597,500# 30/50# SAND; 15,567 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7599 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/19/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1301
MCF_GAS 1186
TUBING_PRESS 1154
Perforation Data:
Interval Top:6573 ft.# Of Holes:118
Interval Bottom:8329 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)14369
GOR598708
GOR DeterminationMCFE
Average BOE per Day6.857
Average MCFE per Day39.781

 Federal Financial Assurance  i Y

 Tribal Well  i No