Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11026
Well Classification: GW Status: PR - 1/30/2006
Well Name/No:AP #24-14-696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/30/2006
FacilityID:279378LocationID:335089
County:GARFIELD #045Location:SWSE 14 6S96W 6
Field:GRAND VALLEY - #31290Elevation:6660 ft.
Basin:PICEANCE BASIN  
Planned Location:144FSL  1763 FELLat/Long: 39.516158 / -108.073506Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.516168 / -108.073687Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/30/2006             Measured TD: 8706 ft.    Vertical TD: 8499 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/30/2006
Wellbore PermitDIRECTIONAL
Permit #:20052501 Expiration Date:8/15/2006
Proposed Top PZ Location:Sec:14 Twp: 6S 96W Footage: 495 FSL  1980 FWL
Bottom Hole Location:Sec:14 Twp: 6S 96W Footage: 495 FSL  1980 FWL
Proposed Depth/Form:8779 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: , Drill Unit: UNSPAC

Wellbore Completed
Completion Date:12/6/2005
Spud Date:11/7/2005Spud Date Is:ACTUAL
Measured TD:8706 ft.Measured PB depth:8662 ft.
True Vertical TD:8499 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 6S 96WFootage: 495 FSL  1980 FWL
Bottom Hole Location:Sec:14 Twp: 6S 96WFootage: 495 FSL  1980 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1131 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1131 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8666 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 990, Top: 6330 ft., Bottom: 8666 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3348 ft.NN
FORT UNION3669 ft.NN
MESAVERDE5335 ft.NN
CAMEO8171 ft.NN
ROLLINS8633 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/30/2006                 Interval Top: 6516 ft.    Interval Bottom: 8595 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/6/2005
Treatment Summary:8,614 GALS 7.5% HCL; 890,500# 20/40 SAND; 21,807 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8130 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/30/2006Test Method:FLOWING
Hours Tested:Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1711
CASING_PRESS 2436
TUBING_PRESS 2169
Perforation Data:
Interval Top:6516 ft.# Of Holes:185
Interval Bottom:8595 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)25
Total Gas Produced (MCF)17466
GOR698640
GOR DeterminationMCFE
Average BOE per Day8.293
Average MCFE per Day48.130

 Federal Financial Assurance  i 

 Tribal Well  i No