Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11008
Well Classification: GW Status: PR - 8/3/2005
Well Name/No:GARFIELD COUNTY #RWF 441-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/3/2005
FacilityID:279146LocationID:335136
County:GARFIELD #045Location:NENE 20 6S94W 6
Field:RULISON - #75400Elevation:5439 ft.
Basin:PICEANCE BASIN  
Planned Location:344FNL  641 FELLat/Long: 39.516980 / -107.905077Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.517093 / -107.905115Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/7/2005             Measured TD: 7962 ft.    Vertical TD: 7956 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/7/2005
Wellbore PermitDIRECTIONAL
Permit #:20052335 Expiration Date:8/2/2006
Proposed Top PZ Location:Sec: Twp: Footage: 188 FNL  633 FEL
Bottom Hole Location:Sec: Twp: Footage: 188 FNL  633 FEL
Proposed Depth/Form:7933 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:7/14/2006
Spud Date:6/20/2006Spud Date Is:ACTUAL
Measured TD:7962 ft.Measured PB depth:7908 ft.
True Vertical TD:7956 ft.True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 6S 94WFootage: 191 FNL  633 FEL
Bottom Hole Location:Sec:20 Twp: 6S 94WFootage: 191 FNL  633 FEL
Log Types:CBL; HIGH RES INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1138 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1138 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7935 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 3588 ft., Bottom: 7935 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1869 ft.NN
MESAVERDE4297 ft.NN
CAMEO7032 ft.NN
ROLLINS7931 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/12/2006                Interval Top: 5733 ft.    Interval Bottom: 7842 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/30/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/29/2006
Treatment Summary:3018 GALS 7 1/2% HCL; 874,300# 20/40 SAND; 19,793 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7233 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/12/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1871
MCF_GAS 782
TUBING_PRESS 1696
Perforation Data:
Interval Top:5733 ft.# Of Holes:133
Interval Bottom:7842 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)44
Total Gas Produced (MCF)21460
GOR487727
GOR DeterminationMCFE
Average BOE per Day10.259
Average MCFE per Day59.530

 Federal Financial Assurance  i Y

 Tribal Well  i No