Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11004
Well Classification: GW Status: PR - 8/3/2005
Well Name/No:GARFIELD COUNTY #RWF 541-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/3/2005
FacilityID:279142LocationID:335136
County:GARFIELD #045Location:NENE 20 6S94W 6
Field:RULISON - #75400Elevation:5439 ft.
Basin:PICEANCE BASIN  
Planned Location:359FNL  638 FELLat/Long: 39.516939 / -107.905101Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.517053 / -107.905106Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/7/2005             Measured TD: 8020 ft.    Vertical TD: 7971 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/7/2005
Wellbore PermitDIRECTIONAL
Permit #:20052337 Expiration Date:8/2/2006
Proposed Top PZ Location:Sec: Twp: Footage: 966 FNL  326 FEL
Bottom Hole Location:Sec: Twp: Footage: 966 FNL  326 FEL
Proposed Depth/Form:7963 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:7/30/2006
Spud Date:7/15/2006Spud Date Is:ACTUAL
Measured TD:8020 ft.Measured PB depth:7955 ft.
True Vertical TD:7971 ft.True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 6S 94WFootage: 955 FNL  316 FEL
Bottom Hole Location:Sec:20 Twp: 6S 94WFootage: 955 FNL  316 FEL
Log Types:CBL;HIGH RESOLUTION INDUCTION,SPECTRAL DENSITY,DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1135 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1135 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8009 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1023, Top: 4320 ft., Bottom: 8008 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1857 ft.NN
MESAVERDE4318 ft.NN
CAMEO7057 ft.NN
ROLLINS7960 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/24/2006                Interval Top: 5707 ft.    Interval Bottom: 7879 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/16/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/15/2006
Treatment Summary:4020 GALS 7 1/2% HCL; 773,200# 20/40 SAND; 19,465 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7296 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/24/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1200
MCF_GAS 847
TUBING_PRESS 715
Perforation Data:
Interval Top:5707 ft.# Of Holes:153
Interval Bottom:7879 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)34
Total Gas Produced (MCF)17420
GOR512352
GOR DeterminationMCFE
Average BOE per Day8.343
Average MCFE per Day48.393

 Federal Financial Assurance  i Y

 Tribal Well  i No