Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10989
Well Classification: GW Status: PR - 12/27/2005
Well Name/No:BORUCH #GM 33-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/27/2005
FacilityID:279076LocationID:334984
County:GARFIELD #045Location:NESE 11 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5259 ft.
Basin:PICEANCE BASIN  
Planned Location:1974FSL  727 FELLat/Long: 39.450109 / -108.070555Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.450220 / -108.070733Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/27/2005             Measured TD: 6292 ft.    Vertical TD: 6120 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/27/2005
Wellbore PermitDIRECTIONAL
Permit #:20052262 Expiration Date:7/28/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2092 FSL  1840 FEL
Bottom Hole Location:Sec: Twp: Footage: 2092 FSL  1840 FEL
Proposed Depth/Form:6322 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:9/28/2005
Spud Date:9/20/2005Spud Date Is:ACTUAL
Measured TD:6292 ft.Measured PB depth:6200 ft.
True Vertical TD:6120 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2092 FSL  1840 FEL
Bottom Hole Location:Sec: Twp: Footage: 2092 FSL  1840 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1122 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1122 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6288 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 3470 ft., Bottom: 6288 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1411 ft.NN
FORT UNION1715 ft.NN
MESAVERDE3191 ft.NN
CAMEO5701 ft.NN
ROLLINS6181 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/27/2005                Interval Top: 4481 ft.    Interval Bottom: 6110 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/28/2005
Treatment Summary:11/8/05 1000 GALS ACETIC ACID; 2050 GALS 7 1/2% HCL 616400# 30/50 SAND; 14543 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5671 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/27/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 997
CASING_PRESS 1058
MCF_GAS 997
TUBING_PRESS 900
Perforation Data:
Interval Top:4481 ft.# Of Holes:101
Interval Bottom:6110 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)2055
GOR
GOR DeterminationMCFE
Average BOE per Day0.973
Average MCFE per Day5.634

 Federal Financial Assurance  i Y

 Tribal Well  i No