Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10987
Well Classification: GW Status: PR - 1/1/2006
Well Name/No:BORUCH #GM 443-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 50872
Facility Status:PRStatus Date1/1/2006
FacilityID:279074LocationID:334984
County:GARFIELD #045Location:NESE 11 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5259 ft.
Basin:PICEANCE BASIN  
Planned Location:1989FSL  701 FELLat/Long: 39.450149 / -108.070455Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.450265 / -108.070643Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2006             Measured TD: 6155 ft.    Vertical TD: 6114 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2006
Wellbore PermitDIRECTIONAL
Permit #:20052260 Expiration Date:7/28/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2544 FSL  572 FEL
Bottom Hole Location:Sec: Twp: Footage: 2544 FSL  572 FEL
Proposed Depth/Form:6233 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:11/14/2005
Spud Date:10/10/2005Spud Date Is:ACTUAL
Measured TD:6155 ft.Measured PB depth:6082 ft.
True Vertical TD:6114 ft.True Vertical PB depth:
Top PZ Location:Sec:11 Twp: 7S 96WFootage: 2538 FSL  561 FEL
Bottom Hole Location:Sec:11 Twp: 7S 96WFootage: 2538 FSL  561 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1140 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1139 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6155 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 2100 ft., Bottom: 6155 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1377 ft.NN
FORT UNION3092 ft.NN
MESAVERDE3092 ft.NN
CAMEO5609 ft.NN
ROLLINS6061 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2006                  Interval Top: 4352 ft.    Interval Bottom: 5972 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/14/2005
Treatment Summary:1000 GALS ACETIC; 2970 GALS 7 1/2% HCL; 705,000# 30/50 SAND; 14,315 BBLS SLICKWATER (SUMMARY) 11/08/2005
Tubing Size:2.375 in.Tubing Setting Depth:5453 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/1/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1178
CASING_PRESS 1259
TUBING_PRESS 1182
Perforation Data:
Interval Top:4352 ft.# Of Holes:95
Interval Bottom:5972 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)11260
GOR804285
GOR DeterminationMCFE
Average BOE per Day5.358
Average MCFE per Day31.077

 Federal Financial Assurance  i 

 Tribal Well  i No