Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10985
Well Classification: GW Status: PR - 3/23/2006
Well Name/No:BORUCH #GM 544-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 50872
Facility Status:PRStatus Date3/23/2006
FacilityID:279072LocationID:334727
Municipality/County:PARACHUTE / GARFIELD #045Location:SESE 11 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5304 ft.
Basin:PICEANCE BASIN  
Planned Location:514FSL  672 FELLat/Long: 39.446099 / -108.070345Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.446220 / -108.070520Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/23/2006             Measured TD: 6131 ft.    Vertical TD: 6128 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/23/2006
Wellbore PermitDIRECTIONAL
Permit #:20052258 Expiration Date:7/28/2006
Proposed Top PZ Location:Sec: Twp: Footage: 566 FSL  558 FEL
Bottom Hole Location:Sec: Twp: Footage: 566 FSL  558 FEL
Proposed Depth/Form:6167 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:12/24/2005
Spud Date:12/17/2005Spud Date Is:ACTUAL
Measured TD:6131 ft.Measured PB depth:6107 ft.
True Vertical TD:6128 ft.True Vertical PB depth:
Top PZ Location:Sec:11 Twp: 7S 96WFootage: 572 FSL  560 FEL
Bottom Hole Location:Sec:11 Twp: 7S 96WFootage: 572 FSL  560 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1132 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1132 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6132 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 3580 ft., Bottom: 6132 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1352 ft.NN
FORT UNION1651 ft.NN
MESAVERDE3081 ft.NN
CAMEO5566 ft.NN
ROLLINS6011 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/23/2006                 Interval Top: 4343 ft.    Interval Bottom: 5770 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/3/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/26/2006
Treatment Summary:1,000 GALS 10% ACETIC ACID; 1,995 GALS 7.5% HCL; 626,100# 30/50 SAND; 14,448 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5243 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/23/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1191
CASING_PRESS 884
TUBING_PRESS 829
Perforation Data:
Interval Top:4343 ft.# Of Holes:92
Interval Bottom:5770 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9997
GOR833083
GOR DeterminationMCFE
Average BOE per Day4.758
Average MCFE per Day27.584

 Federal Financial Assurance  i 

 Tribal Well  i No