Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10970
Well Classification: GW Status: PR - 5/1/2006
Well Name/No:BORUCH #GM 514-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2006
FacilityID:278944LocationID:334722
Municipality/County:PARACHUTE / GARFIELD #045Location:SWSW 12 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5143 ft.
Basin:PICEANCE BASIN  
Planned Location:299FSL  969 FWLLat/Long: 39.445549 / -108.064535Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.445687 / -108.064700Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2006             Measured TD: 6030 ft.    Vertical TD: 6004 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2006
Wellbore PermitDIRECTIONAL
Permit #:20052219 Expiration Date:7/24/2006
Proposed Top PZ Location:Sec: Twp: Footage: 575 FSL  629 FWL
Bottom Hole Location:Sec: Twp: Footage: 575 FSL  629 FWL
Proposed Depth/Form:6053 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:3/8/2006
Spud Date:2/28/2006Spud Date Is:ACTUAL
Measured TD:6030 ft.Measured PB depth:5970 ft.
True Vertical TD:6004 ft.True Vertical PB depth:
Top PZ Location:Sec:12 Twp: 7S 96WFootage: 576 FSL  629 FWL
Bottom Hole Location:Sec:12 Twp: 7S 96WFootage: 576 FSL  629 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1134 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1134 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6016 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 765, Top: 3030 ft., Bottom: 6016 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1085 ft.NN
FORT UNION1519 ft.NN
MESAVERDE2977 ft.NN
CAMEO5465 ft.NN
ROLLINS5936 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/1/2006                  Interval Top: 4083 ft.    Interval Bottom: 5864 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/20/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/14/2006
Treatment Summary:2,961 GALS 7.5% HCL; 864,000# 30/50 SAND; 19,792 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5224 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/26/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1119
CASING_PRESS 1483
MCF_GAS 1119
TUBING_PRESS 1334
Perforation Data:
Interval Top:4083 ft.# Of Holes:121
Interval Bottom:5864 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)12665
GOR791562
GOR DeterminationMCFE
Average BOE per Day6.024
Average MCFE per Day34.960

 Federal Financial Assurance  i 

 Tribal Well  i No