Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10969
Well Classification: GW Status: PR - 5/26/2006
Well Name/No:BORUCH #GM 324-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/26/2006
FacilityID:278945LocationID:334722
Municipality/County:PARACHUTE / GARFIELD #045Location:SWSW 12 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5143 ft.
Basin:PICEANCE BASIN  
Planned Location:288FSL  997 FWLLat/Long: 39.445529 / -108.064435Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.445659 / -108.064601Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/26/2006             Measured TD: 6225 ft.    Vertical TD: 6033 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/26/2006
Wellbore PermitDIRECTIONAL
Permit #:20052218 Expiration Date:7/24/2006
Proposed Top PZ Location:Sec: Twp: Footage: 226 FSL  2063 FWL
Bottom Hole Location:Sec: Twp: Footage: 226 FSL  2063 FWL
Proposed Depth/Form:6237 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:3/27/2006
Spud Date:3/19/2006Spud Date Is:ACTUAL
Measured TD:6225 ft.Measured PB depth:6140 ft.
True Vertical TD:6033 ft.True Vertical PB depth:
Top PZ Location:Sec:12 Twp: 7S 96WFootage: 238 FSL  2077 FWL
Bottom Hole Location:Sec:12 Twp: 7S 96WFootage: 238 FSL  2077 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1125 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1125 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6200 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 805, Top: 2430 ft., Bottom: 6200 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1100 ft.NN
FORT UNION1553 ft.NN
MESAVERDE3145 ft.NN
CAMEO5656 ft.NN
ROLLINS6087 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/26/2006                 Interval Top: 4405 ft.    Interval Bottom: 6033 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/17/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/14/2006
Treatment Summary:3,008 GALS 7.5% HCL; 766,500# 30/50 SAND; 17,865 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5575 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/26/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1211
CASING_PRESS 1423
MCF_GAS 1211
TUBING_PRESS 1386
Perforation Data:
Interval Top:4405 ft.# Of Holes:111
Interval Bottom:6033 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)15337
GOR807210
GOR DeterminationMCFE
Average BOE per Day7.299
Average MCFE per Day42.351

 Federal Financial Assurance  i 

 Tribal Well  i No