Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10937
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:CHEVRON #13-213
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:278788LocationID:311623
County:GARFIELD #045Location:SWNW 13 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8297 ft.
Basin:PICEANCE BASIN  
Planned Location:2478FNL  414 FWLLat/Long: 39.523347 / -108.176519Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.523403 / -108.176573Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 9200 ft.    Vertical TD: 9186 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore Permit
Permit #:20052077 Expiration Date:7/13/2006
Proposed Top PZ Location:Sec:13 Twp: 6S 97W Footage: 2393 FNL  328 FWL
Bottom Hole Location:Sec:13 Twp: 6S 97W Footage: 2393 FNL  328 FWL
Proposed Depth/Form:10000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/16/2005
Spud Date:10/25/2005Spud Date Is:ACTUAL
Measured TD:9200 ft.Measured PB depth:
True Vertical TD:9186 ft.True Vertical PB depth:
Top PZ Location:Sec:13 Twp: 6S 97WFootage: 2393 FNL  328 FWL
Bottom Hole Location:Sec:13 Twp: 6S 97WFootage: 2393 FNL  328 FWL
Log Types:SCHLUMB. RESERVOIR SATURATION GAMMA RAY COLLAR LOG, CEMENT BOND TEMPERATURE GAMMA RAY
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2936 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1680, Top: 0 ft., Bottom: 3051 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 17 ft., Depth: 9181 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 4000 ft., Bottom: 9181 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6139 ft.9064 ft.NN
ROLLINS9065 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 5/1/2025                  Interval Top: 6813 ft.    Interval Bottom: 8590 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:12/12/2006Choke Size:0.234 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/12/2006
Treatment Summary:23,101 BBLS FLUID/FLUSH; 885,789# 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:8701 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1112
CASING_PRESS 1630
MCF_GAS 1112
TUBING_PRESS 1300
Perforation Data:
Interval Top:6813 ft.# Of Holes:140
Interval Bottom:8590 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)6
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.017

 Federal Financial Assurance  i 

 Tribal Well  i No