Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10917
Well Classification: GW Status: PR - 4/18/2006
Well Name/No:FEDERAL #GM 524-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 24603
Facility Status:PRStatus Date4/18/2006
FacilityID:278674LocationID:334717
County:GARFIELD #045Location:NWNW 9 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6080 ft.
Basin:PICEANCE BASIN  
Planned Location:677FNL  571 FWLLat/Long: 39.456749 / -108.120316Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.456810 / -108.119890Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/18/2006             Measured TD: 6802 ft.    Vertical TD: 6687 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/18/2006
Wellbore PermitDIRECTIONAL
Permit #:20061911 Expiration Date:6/22/2007
Proposed Top PZ Location:Sec: Twp: Footage: 125 FSL  1247 FWL
Bottom Hole Location:Sec:4 Twp: 7S 96W Footage: 125 FSL  1247 FWL
Proposed Depth/Form:6833 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:7/3/2006
Spud Date:6/24/2006Spud Date Is:ACTUAL
Measured TD:6802 ft.Measured PB depth:6750 ft.
True Vertical TD:6687 ft.True Vertical PB depth:
Top PZ Location:Sec:4 Twp: 7S 96WFootage: 138 FSL  1251 FWL
Bottom Hole Location:Sec:4 Twp: 7S 96WFootage: 138 FSL  1251 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1130 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1130 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6784 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 833, Top: 3620 ft., Bottom: 6784 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2134 ft.NN
FORT UNION2475 ft.NN
MESAVERDE3704 ft.NN
CAMEO6174 ft.NN
ROLLINS6632 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/30/2006                 Interval Top: 5115 ft.    Interval Bottom: 6605 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/1/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/29/2006
Treatment Summary:2% KCL BBLS 1000; 2,482 GALS 7.5 % HCL; 683,700# 30/50 SAND; 14,462 BBLS SLICKWATER; 274 TONS CO2 ASSIST.
Tubing Size:2.375 in.Tubing Setting Depth:6214 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/30/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1302
MCF_GAS 1203
TUBING_PRESS 1165
Perforation Data:
Interval Top:5115 ft.# Of Holes:88
Interval Bottom:6605 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)11066
GOR553300
GOR DeterminationMCFE
Average BOE per Day5.286
Average MCFE per Day30.652

 Federal Financial Assurance  i Y

 Tribal Well  i No