Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10882
Well Classification: GW Status: PR - 11/1/2024
Well Name/No:FEDERAL #30-1BB (PA30)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C 01523
Facility Status:PRStatus Date11/1/2024
FacilityID:278446LocationID:334663
County:GARFIELD #045Location:NENE 30 7S95W 6
Field:PARACHUTE - #67350Elevation:5805 ft.
Basin:PICEANCE BASIN  
Planned Location:524FNL  427 FELLat/Long: 39.414190 / -108.031623Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.414180 / -108.031730Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/1/2024             Measured TD: 6387 ft.    Vertical TD: 6307 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20051857 Expiration Date:6/22/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1150 FNL  660 FEL
Bottom Hole Location:Sec: Twp: Footage: 1150 FNL  660 FEL
Proposed Depth/Form:6375 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-46 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-44 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:9/26/2005
Spud Date:8/22/2005Spud Date Is:ACTUAL
Measured TD:6387 ft.Measured PB depth:6250 ft.
True Vertical TD:6307 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1150 FNL  660 FEL
Bottom Hole Location:Sec: Twp: Footage: 1150 FNL  660 FEL
Log Types:PEX, CBL/GR/TEMP
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1526 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 1511 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6378 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 2620 ft., Bottom: 6387 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.NN
WILLIAMS FORK3849 ft.NN
ROLLINS6329 ft.NN

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 11/1/2024                 Interval Top: 4605 ft.    Interval Bottom: 6097 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:11/18/2005Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/31/2012
Treatment Summary:CBP AT 4535' AND 2055' DRILLED OUT. WELL HAS BEEN REMOVED FROM TA STATUS AND IS READY TO RETURN TO PRODUCTION.
Formation Treatment
Treatment Date:8/25/2011
Treatment Summary:CBP SET AT 4535' AND TESTED TO 1000 PSI. SECOND CBP SET AT 2055', TESTED TO 1500 PSI AND2 SX CEMENT DUMPED ON TOP.
Formation Treatment
Treatment Date:9/26/2005
Treatment Summary:STAGES 1-6 WERE TREATED WITH A TOTAL OF 16,130 BBLS SLICKWATER AND 642,000 LBS 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 260
BBLS_OIL 0
BTU_GAS 1170
CALC_BBLS_H2O 260
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1662
CASING_PRESS 1250
MCF_GAS 1662
TUBING_PRESS 750
Perforation Data:
Interval Top:4605 ft.# Of Holes:114
Interval Bottom:6097 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8634
GOR
GOR DeterminationMCFE
Average BOE per Day4.083
Average MCFE per Day23.660

 Federal Financial Assurance  i Y

 Tribal Well  i No