Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10873
Well Classification: GW Status: PR - 5/17/2012
Well Name/No:FEDERAL #28-6 (PL28)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 1523
Facility Status:PRStatus Date5/17/2012
FacilityID:278374LocationID:334071
County:GARFIELD #045Location:NWSW 28 7S95W 6
Field:PARACHUTE - #67350Elevation:7162 ft.
Basin:PICEANCE BASIN  
Planned Location:2056FSL  692 FWLLat/Long: 39.406900 / -108.008763Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.406790 / -108.009150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/17/2012             Measured TD: 8848 ft.    Vertical TD: 8461 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/17/2012
Wellbore PermitDIRECTIONAL
Permit #:20051639 Expiration Date:6/19/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1810 FNL  1980 FWL
Bottom Hole Location:Sec:28 Twp: Footage: 1810 FNL  1980 FWL
Proposed Depth/Form:9304 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-48 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-31 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:10/31/2005
Spud Date:9/23/2005Spud Date Is:ACTUAL
Measured TD:8848 ft.Measured PB depth:8451 ft.
True Vertical TD:8461 ft.True Vertical PB depth:8064 ft.
Top PZ Location:Sec:28 Twp: 7S 95WFootage: 1759 FNL  2038 FWL
Bottom Hole Location:Sec:28 Twp: 7S 95WFootage: 1767 FNL  2029 FWL
Log Types:PEX - AIL/SP/GR/CN-CD, CBL
Log Types:CBL,PEX
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 58 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 4, Top: 0 ft., Bottom: 58 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1533 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 0 ft., Bottom: 1534 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8848 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 5120 ft., Bottom: 8848 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: , Depth: 6650 ft., Bottom: 7200 ft., Sacks: 200, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4670 ft., Depth: 5240 ft., Bottom: 7200 ft., Sacks: 100, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.5692 ft.
WILLIAMS FORK5693 ft.8239 ft.
ROLLINS8240 ft.8553 ft.
COZZETTE8554 ft.8782 ft.
CORCORAN8783 ft.8848 ft.

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/17/2012                 Interval Top: 6598 ft.    Interval Bottom: 8195 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:9/28/2006Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/9/2012
Treatment Summary:CBP AT 6505' AND 5155' WERE DRILLED OUT REMOVING THIS WELL FROM TA STATUS
Formation Treatment
Treatment Date:8/29/2011
Treatment Summary:SET CBP @ 6505' TESTED TO 1000 PSI. SET SECOND CUP CBP @ 5155' TO ISOLATE SQUEEZE PERFS, TESTED TO 1500 PSI AND TOPPED WITH 2 SX CEMENT.
Formation Treatment
Treatment Date:8/9/2006
Treatment Summary:STAGES 1 THROUGH 5 WERE TREATEDD WITH TOTAL OF 20,613 BBL SLICKWATER, & 755,032 LBS 20/40 WHITE SAND. TO REMEDIATE TOC, 4 SQUEEZE HOLES WRE SHOT AT 6650' & SQUEEZED W/100 SX G;FOLLOWED BY ADDITIONAL 100 SX G CEMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 720
BTU_GAS 1170
CALC_BBLS_H2O 720
CALC_MCF_GAS 1410
CASING_PRESS 2000
MCF_GAS 1410
TUBING_PRESS 1000
Perforation Data:
Interval Top:6598 ft.# Of Holes:110
Interval Bottom:8195 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)25
Total Gas Produced (MCF)15068
GOR602720
GOR DeterminationMCFE
Average BOE per Day7.185
Average MCFE per Day41.690

 Federal Financial Assurance  i Y

 Tribal Well  i No